Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22086
Well Classification: GW Status: PR - 1/15/2014
Well Name/No:WPX Energy #RMV 163-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/15/2014
FacilityID:433491LocationID:323991
County:GARFIELD #045Location:LOT 2 4 7S94W 6
Field:RULISON - #75400Elevation:5794 ft.
Basin:PICEANCE BASIN  
Planned Location:435FNL  1695 FELLat/Long: 39.473278 / -107.889002Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.473278 / -107.889002Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/13/2013
End Date: 12/17/2013
Reported: 1/30/2014
Days to report: 44
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/15/2014             Measured TD: 8470 ft.    Vertical TD: 8028 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/15/2014
Wellbore PermitDirectional
Permit #: Expiration Date:7/2/2015
Proposed Top PZ Location:Sec:4 Twp: 7S 94W Footage: 2418 FNL  2106 FEL
Bottom Hole Location:Sec:4 Twp: 7S 94W Footage: 2418 FNL  2106 FEL
Proposed Depth/Form:8450 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 640, Drill Unit: Sec. 4: All
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 60, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1165 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 307, Top: 0 ft., Bottom: 1165 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8450 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 938, Top: , Bottom: 8450 ft.

Wellbore Completed
Completion Date:11/22/2013
Spud Date:11/12/2013Spud Date Is:ACTUAL
Measured TD:8470 ft.Measured PB depth:8371 ft.
True Vertical TD:8028 ft.True Vertical PB depth:7929 ft.
Top PZ Location:Sec:4 Twp: 7S 94WFootage: 2403 FNL  2150 FEL
Bottom Hole Location:Sec:4 Twp: 7S 94WFootage: 2408 FNL  2132 FEL
Log Types:RPM CBL MUDLOGS
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 42 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 16, Top: 0 ft., Bottom: 42 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1192 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1192 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8456 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1190, Top: 3900 ft., Bottom: 8456 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2133 ft.
MESAVERDE4791 ft.
CAMEO7380 ft.
ROLLINS8270 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/15/2014                 Interval Top: 6172 ft.    Interval Bottom: 8109 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/14/2013Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/13/2013Treatment End Date:12/17/2013
Treatment Summary:6 STAGES; 1475 Gals 7 ½% HCL; 658300 # 40/70 Sand: 19014 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):19084Max pressure during treatment (psi):6111
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):35Min frac gradient (psi/ft):0.81
Recycled water used in treatment (bbls):19049Total flowback volume recovered (bbls):8095
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):658300Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7887 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/15/2014Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1062
CALC_MCF_GAS 772
CASING_PRESS 1273
MCF_GAS 772
TUBING_PRESS 827
Perforation Data:
Interval Top:6172 ft.# Of Holes:125
Interval Bottom:8109 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)33
Total Gas Produced (MCF)17151
GOR519727
GOR DeterminationMCFE
Average BOE per Day8.202
Average MCFE per Day47.538

 Federal Financial Assurance  i 

 Tribal Well  i No