Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22085
Well Classification: GW Status: PR - 2/1/2026
Well Name/No:WPX Energy #RWF 422-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2026
FacilityID:433490LocationID:323991
County:GARFIELD #045Location:LOT 2 4 7S94W 6
Field:RULISON - #75400Elevation:5794 ft.
Basin:PICEANCE BASIN  
Planned Location:449FNL  1712 FELLat/Long: 39.473237 / -107.889061Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.473237 / -107.889062Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/30/2014
End Date: 2/4/2014
Reported: 3/14/2014
Days to report: 38
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/1/2026             Measured TD: 8766 ft.    Vertical TD: 8028 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/1/2026
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/2/2015
Proposed Top PZ Location:Sec:4 Twp: 7S 94W Footage: 2374 FNL  1928 FWL
Bottom Hole Location:Sec:4 Twp: 7S 94W Footage: 2374 FNL  1928 FWL
Proposed Depth/Form:8771 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 640, Drill Unit: Sec. 4: All
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 60, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2529 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 644, Top: 0 ft., Bottom: 2529 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8771 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 934, Top: , Bottom: 8771 ft.

Wellbore Completed
Completion Date:12/27/2013
Spud Date:12/16/2013Spud Date Is:ACTUAL
Measured TD:8766 ft.Measured PB depth:8724 ft.
True Vertical TD:8028 ft.True Vertical PB depth:7986 ft.
Top PZ Location:Sec:4 Twp: 7S 94WFootage: 2387 FNL  1803 FWL
Bottom Hole Location:Sec:4 Twp: 7S 94WFootage: 2388 FNL  1829 FWL
Log Types:CBL/RPM/MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 63 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 24, Top: 0 ft., Bottom: 63 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2573 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 630, Top: 0 ft., Bottom: 2573 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8759 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1190, Top: 4888 ft., Bottom: 8759 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2312 ft.
MESAVERDE5122 ft.
CAMEO7682 ft.
ROLLINS8614 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 2/1/2026                  Interval Top: 6470 ft.    Interval Bottom: 8448 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/1/2014Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/30/2014Treatment End Date:2/4/2014
Treatment Summary:1472 Gals 7 ½% HCL; 747775 # 40/70 Sand: 21189 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):21225Max pressure during treatment (psi):6521
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):35Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):21189Total flowback volume recovered (bbls):132
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):747775Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8236 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/28/2014Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1062
CALC_MCF_GAS 1028
CASING_PRESS 1775
MCF_GAS 1028
TUBING_PRESS 1321
Perforation Data:
Interval Top:6470 ft.# Of Holes:129
Interval Bottom:8448 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)35
Total Gas Produced (MCF)18151
GOR518600
GOR DeterminationMCFE
Average BOE per Day8.715
Average MCFE per Day50.538

 Federal Financial Assurance  i 

 Tribal Well  i No