Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22084
Well Classification: GW Status: PR - 3/1/2014
Well Name/No:WPX Energy #RWF 342-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2014
FacilityID:433489LocationID:323991
County:GARFIELD #045Location:LOT 2 4 7S94W 6
Field:RULISON - #75400Elevation:5794 ft.
Basin:PICEANCE BASIN  
Planned Location:405FNL  1663 FELLat/Long: 39.473361 / -107.888883Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.473360 / -107.888883Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/4/2013
End Date: 11/11/2013
Reported: 1/2/2014
Days to report: 52
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/1/2014             Measured TD: 8620 ft.    Vertical TD: 7987 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/1/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/2/2015
Proposed Top PZ Location:Sec:4 Twp: 7S 94W Footage: 2419 FNL  193 FEL
Bottom Hole Location:Sec:4 Twp: 7S 94W Footage: 2419 FNL  193 FEL
Proposed Depth/Form:8600 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 640, Drill Unit: Sec. 4: All
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 60, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2474 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 631, Top: 0 ft., Bottom: 2474 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8600 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 929, Top: , Bottom: 8600 ft.

Wellbore Completed
Completion Date:9/24/2013
Spud Date:9/13/2013Spud Date Is:ACTUAL
Measured TD:8620 ft.Measured PB depth:8412 ft.
True Vertical TD:7987 ft.True Vertical PB depth:7779 ft.
Top PZ Location:Sec:4 Twp: 7S 94WFootage: 2403 FNL  226 FEL
Bottom Hole Location:Sec:4 Twp: 7S 94WFootage: 2384 FNL  214 FEL
Log Types:RPM/CBL/MUDLOGS
Casing:String Type: CONDUCTOR, Hole Size: 23 in., Size: 15 in., Top: 0 ft., Depth: 42 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 16, Top: 0 ft., Bottom: 42 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2477 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 585, Top: 0 ft., Bottom: 2477 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8605 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1165, Top: 3970 ft., Bottom: 8605 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2496 ft.
MESAVERDE4935 ft.
CAMEO7539 ft.
ROLLINS8456 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 3/1/2014                  Interval Top: 6558 ft.    Interval Bottom: 8226 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/4/2013Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/4/2013Treatment End Date:11/11/2013
Treatment Summary:2286 Gals 7 ½% HCL; 1510201 # 40/70 Sand: 42830 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):42884Max pressure during treatment (psi):6515
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):54Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):42830Total flowback volume recovered (bbls):20059
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1510201Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8025 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/9/2013Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1058
CALC_MCF_GAS 1272
CASING_PRESS 2182
MCF_GAS 1272
TUBING_PRESS 1793
Perforation Data:
Interval Top:6558 ft.# Of Holes:224
Interval Bottom:8226 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)69
Total Gas Produced (MCF)36246
GOR525304
GOR DeterminationMCFE
Average BOE per Day17.312
Average MCFE per Day100.416

 Federal Financial Assurance  i 

 Tribal Well  i No