Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22082
Well Classification: GW Status: PR - 7/17/2014
Well Name/No:WPX Energy #RWF 341-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/17/2014
FacilityID:433487LocationID:323991
County:GARFIELD #045Location:LOT 2 4 7S94W 6
Field:RULISON - #75400Elevation:5794 ft.
Basin:PICEANCE BASIN  
Planned Location:410FNL  1668 FELLat/Long: 39.473347 / -107.888903Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.473347 / -107.888903Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/4/2013
End Date: 11/11/2013
Reported: 1/2/2014
Days to report: 52
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/17/2014             Measured TD: 8060 ft.    Vertical TD: 8028 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/17/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/2/2015
Proposed Top PZ Location:Sec:4 Twp: 7S 94W Footage: 844 FNL  1328 FEL
Bottom Hole Location:Sec:4 Twp: 7S 94W Footage: 844 FNL  1328 FEL
Proposed Depth/Form:8049 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 640, Drill Unit: Sec. 4: All
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 60, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1105 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 292, Top: 0 ft., Bottom: 1105 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8049 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 943, Top: , Bottom: 8049 ft.

Wellbore Completed
Completion Date:10/3/2013
Spud Date:9/25/2013Spud Date Is:ACTUAL
Measured TD:8060 ft.Measured PB depth:7812 ft.
True Vertical TD:8028 ft.True Vertical PB depth:7780 ft.
Top PZ Location:Sec:4 Twp: 7S 94WFootage: 851 FNL  1336 FEL
Bottom Hole Location:Sec:4 Twp: 7S 94WFootage: 874 FNL  1342 FEL
Log Types:SP/GR/HDIL/ZDL/RPM/CN/CBL/MUDLOGS
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 63 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 24, Top: 0 ft., Bottom: 63 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1156 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1156 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8052 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1200, Top: 3365 ft., Bottom: 8052 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1982 ft.
MESAVERDE4387 ft.
CAMEO6947 ft.
ROLLINS7937 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 8/1/2014                  Interval Top: 5949 ft.    Interval Bottom: 7618 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/4/2013Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/4/2013Treatment End Date:11/11/2013
Treatment Summary:2451 Gals 7 ½% HCL; 1739793# 40/70 SAND; 48548 BBLS SLICKWATER; (SUMMARY)
Total fluid used in treatment (bbls):48606Max pressure during treatment (psi):6443
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:11
Total acid used in treatment (bbls):58Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):48548Total flowback volume recovered (bbls):19518
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1739793Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7424 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/11/2013Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1058
CALC_MCF_GAS 1196
CASING_PRESS 2165
MCF_GAS 1196
TUBING_PRESS 1694
Perforation Data:
Interval Top:5949 ft.# Of Holes:242
Interval Bottom:7618 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)59
Total Gas Produced (MCF)30401
GOR515271
GOR DeterminationMCFE
Average BOE per Day14.530
Average MCFE per Day84.266

 Federal Financial Assurance  i 

 Tribal Well  i No