Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22028
Well Classification: GW Status: PR - 3/29/2014
Well Name/No:Federal #PA 542-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:62161
Facility Status:PRStatus Date3/29/2014
FacilityID:432711LocationID:417668
County:GARFIELD #045Location:SENW 21 6S95W 6
Field:PARACHUTE - #67350Elevation:6030 ft.
Basin:PICEANCE BASIN  
Planned Location:2610FNL  1456 FWLLat/Long: 39.510486 / -108.007938Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.510486 / -108.007939Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/27/2014
End Date: 3/3/2014
Reported: 4/11/2014
Days to report: 39
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/29/2014             Measured TD: 9781 ft.    Vertical TD: 8784 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/29/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:4/28/2015
Proposed Top PZ Location:Sec:21 Twp: 6S 95W Footage: 2602 FNL  258 FEL
Bottom Hole Location:Sec:21 Twp: 6S 95W Footage: 2602 FNL  258 FEL
Proposed Depth/Form:9751 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1101 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 291, Top: 0 ft., Bottom: 1101 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9751 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 904, Top: 5872 ft., Bottom: 9751 ft.

Wellbore Completed
Completion Date:1/14/2014
Spud Date:1/1/2014Spud Date Is:ACTUAL
Measured TD:9781 ft.Measured PB depth:9732 ft.
True Vertical TD:8784 ft.True Vertical PB depth:8735 ft.
Top PZ Location:Sec:21 Twp: 6S 95WFootage: 2601 FNL  323 FEL
Bottom Hole Location:Sec:21 Twp: 6S 95WFootage: 2628 FNL  240 FEL
Log Types:CBL, Mud, and Reservoir Performance Monitor (RPM)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 81 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 57, Top: 0 ft., Bottom: 81 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1117 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 1117 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9771 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1005, Top: 6246 ft., Bottom: 9771 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3419 ft.
MESAVERDE6072 ft.
CAMEO8927 ft.
ROLLINS9680 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 3/29/2014                 Interval Top: 7357 ft.    Interval Bottom: 9441 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/28/2014Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/27/2014Treatment End Date:3/3/2014
Treatment Summary:1182800# 40/70 Sand; 52495 Bbls Slickwater; (Summary) *All flowback water entries are total estimates based on commingled volumes.
Total fluid used in treatment (bbls):52495Max pressure during treatment (psi):5929
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.70
Recycled water used in treatment (bbls):52495Total flowback volume recovered (bbls):23993
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1182800Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9254 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/29/2014Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1056
CALC_MCF_GAS 695
CASING_PRESS 2224
MCF_GAS 695
TUBING_PRESS 1161
Perforation Data:
Interval Top:7357 ft.# Of Holes:146
Interval Bottom:9441 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)91
Total Gas Produced (MCF)36873
GOR405197
GOR DeterminationMCFE
Average BOE per Day17.668
Average MCFE per Day102.463

 Federal Financial Assurance  i Y

 Tribal Well  i No