Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-21860
Well Classification: GW Status: PR - 12/9/2013
Well Name/No:Federal #PA 421-27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62161
Facility Status:PRStatus Date12/9/2013
FacilityID:431679LocationID:335168
County:GARFIELD #045Location:LOT 6 27 6S95W 6
Field:PARACHUTE - #67350Elevation:5840 ft.
Basin:PICEANCE BASIN  
Planned Location:2113FNL  1307 FWLLat/Long: 39.496690 / -107.989129Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.496691 / -107.989130Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/8/2013
End Date: 10/15/2013
Reported: 11/19/2013
Days to report: 35
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/9/2013             Measured TD: 8575 ft.    Vertical TD: 8416 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/9/2013
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:2/7/2015
Proposed Top PZ Location:Sec:27 Twp: 6S 95W Footage: 902 FNL  1903 FWL
Bottom Hole Location:Sec:27 Twp: 6S 95W Footage: 902 FNL  1903 FWL
Proposed Depth/Form:8551 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3654 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 923, Top: 0 ft., Bottom: 3654 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8551 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 896, Top: 4715 ft., Bottom: 8551 ft.

Wellbore Completed
Completion Date:8/7/2013
Spud Date:7/27/2013Spud Date Is:ACTUAL
Measured TD:8575 ft.Measured PB depth:8522 ft.
True Vertical TD:8416 ft.True Vertical PB depth:8363 ft.
Top PZ Location:Sec:27 Twp: 6S 95WFootage: 960 FNL  1882 FWL
Bottom Hole Location:Sec:27 Twp: 6S 95WFootage: 872 FNL  1918 FWL
Log Types:CBL, Mud, and Reservoir Performance Monitor (RPM)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 40 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 23, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2791 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 640, Top: 0 ft., Bottom: 2791 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8557 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 960, Top: 4272 ft., Bottom: 8557 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2662 ft.
MESAVERDE4930 ft.
CAMEO7704 ft.
ROLLINS8447 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 11/16/2013                Interval Top: 6069 ft.    Interval Bottom: 8388 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/8/2013Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/8/2013Treatment End Date:10/15/2013
Treatment Summary:1004900# 40/70 Sand; 26948 Bbls Slickwater; (Summary) *All flowback water entries are total estimates based on commingled volumes.
Total fluid used in treatment (bbls):26948Max pressure during treatment (psi):4600
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.73
Recycled water used in treatment (bbls):26948Total flowback volume recovered (bbls):17482
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1004900Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7929 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/16/2013Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1063
CALC_MCF_GAS 1015
CASING_PRESS 2235
MCF_GAS 1015
TUBING_PRESS 1986
Perforation Data:
Interval Top:6069 ft.# Of Holes:149
Interval Bottom:8388 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)65
Total Gas Produced (MCF)35913
GOR552507
GOR DeterminationMCFE
Average BOE per Day17.148
Average MCFE per Day99.459

 Federal Financial Assurance  i Y

 Tribal Well  i No