|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: DG - 5/6/2013 Measured TD: 5969 ft. Vertical TD: 5736 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW DG - 5/6/2013 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/25/2014 | | Proposed Top PZ Location: | Sec:24 Twp: 6S 93W | Footage: 1784 FNL 2240 FWL | | Bottom Hole Location: | Sec:24 Twp: 6S 93W | Footage: 1784 FNL 2240 FWL | | Proposed Depth/Form: | 8164 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | Grass Mesa | Unit Number: | COC056608X | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: Linepipe , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1100 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 354, Top: 0 ft., Bottom: 1100 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8164 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 526, Top: 0 ft., Bottom: 8164 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/2/2013 | | Spud Date: | 5/6/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 5969 ft. | Measured PB depth: | 5400 ft. | | True Vertical TD: | 5736 ft. | True Vertical PB depth: | 5167 ft. | | Bottom Hole Location: | Sec:24 Twp: 6S 93W | Footage: 1788 FNL 2203 FWL | | Log Types: | Mud logs | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 43 ft., Weight: 42.09 , Citings Type: ACTUAL | | Cement: | Sacks: 114, Top: 0 ft., Bottom: 43 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1046 ft., Weight: 36.0 , Citings Type: ACTUAL | | Cement: | Sacks: 395, Top: 0 ft., Bottom: 1046 ft., Determination Method: VISU | | Casing: | String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: 1046 ft., Depth: 5969 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 270, Top: 4258 ft., Bottom: 4758 ft., Determination Method: CALC | | Additional Cement: | String Type: OPEN HOLE , Top: 4258 ft., Depth: , Bottom: 4758 ft., Sacks: 270, Method: | | No formation data to display. |
Sidetrack #01 Wellbore Classification: GW Status: PR - 2/4/2014 Measured TD: 8013 ft. Vertical TD: 7980 ft.| Wellbore Data for Sidetrack #01 | Wellbore Classification: GW PR - 2/4/2014 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/25/2015 | | Proposed Top PZ Location: | Sec:24 Twp: 6S 93W | Footage: 1784 FNL 2240 FWL | | Bottom Hole Location: | Sec:24 Twp: 6S 93W | Footage: 1784 FNL 2240 FWL | | Proposed Depth/Form: | 8164 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | Grass Mesa | Unit Number: | COC056608X | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: line pipe, Citings Type: PLANNED | | Cement: | Sacks: , Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1047 ft., Weight: 36# , Citings Type: PLANNED | | Cement: | Sacks: 354, Top: 0 ft., Bottom: 1047 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8164 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 526, Top: , Bottom: 8164 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/2/2013 | | Spud Date: | 5/6/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 8013 ft. | Measured PB depth: | 7928 ft. | | True Vertical TD: | 7980 ft. | True Vertical PB depth: | 7895 ft. | | Top PZ Location: | Sec:24 Twp: 6S 93W | Footage: 1772 FNL 2252 FWL | | Bottom Hole Location: | Sec:24 Twp: 6S 93W | Footage: 1789 FNL 2235 FWL | | Log Types: | CBL, RST, Mud, Temperature logs | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 43 ft., Weight: 42.09 , Citings Type: ACTUAL | | Cement: | Sacks: 114, Top: 0 ft., Bottom: 43 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1046 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 395, Top: 0 ft., Bottom: 1046 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7993 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 949, Top: 2665 ft., Bottom: 7993 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 4968 ft. | 7878 ft. | | | | ROLLINS | 7878 ft. | 8013 ft. | | |
Formation WMFK Formation Classification: OW Status: PR - 1/11/2014 Interval Top: 6026 ft. Interval Bottom: 7789 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 12/24/2013 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 11/30/2013 | Treatment End Date: | 12/20/2013 | | Treatment Summary: | Stage 1 - Stage 7 treated with a total of: 94,000 bbls of Slickwater (BWS). | | Total fluid used in treatment (bbls): | 94000 | Max pressure during treatment (psi): | 1314 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.40 | | Type Of gas: | | Number Of staged intervals: | 7 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.77 | | Recycled water used in treatment (bbls): | 94000 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7114 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/11/2014 | Test Method: | Flows from well | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 147 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 147 | | CALC_MCF_GAS | 631 | | CASING_PRESS | 725 | | MCF_GAS | 631 | | TUBING_PRESS | 420 |
| | Perforation Data: | | Interval Top: | 6026 ft. | # Of Holes: | 189 | | Interval Bottom: | 7789 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 282 |
| Total Gas Produced (MCF) | 17482 |
| GOR | 61992 |
| GOR Determination | MCFE |
| Average BOE per Day | 9.030 |
| Average MCFE per Day | 52.379 |
| Federal Financial Assurance | i | Y |
|
|