Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-21794
Well Classification: GW Status: PR - 3/1/2014
Well Name/No:Federal #RU 22-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC41916
Facility Status:PRStatus Date3/1/2014
FacilityID:430866LocationID:383328
County:GARFIELD #045Location:LOT 2 5 7S93W 6
Field:RULISON - #75400Elevation:7602 ft.
Basin:PICEANCE BASIN  
Planned Location:250FNL  2612 FWLLat/Long: 39.474673 / -107.798771Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.474673 / -107.798770Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/2/2013
End Date: 11/7/2013
Reported: 1/2/2014
Days to report: 56
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/1/2014             Measured TD: 10050 ft.    Vertical TD: 9983 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/1/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/25/2014
Proposed Top PZ Location:Sec:5 Twp: 7S 93W Footage: 806 FNL  1888 FWL
Bottom Hole Location:Sec:5 Twp: 7S 93W Footage: 834 FNL  1863 FWL
Proposed Depth/Form:10041 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-76 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1108 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 292, Top: 0 ft., Bottom: 1108 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10041 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 976, Top: , Bottom: 10041 ft.

Wellbore Completed
Completion Date:9/15/2013
Spud Date:9/4/2013Spud Date Is:ACTUAL
Measured TD:10050 ft.Measured PB depth:9971 ft.
True Vertical TD:9983 ft.True Vertical PB depth:9904 ft.
Top PZ Location:Sec:5 Twp: 7S 93WFootage: 806 FNL  1888 FWL
Bottom Hole Location:Sec:5 Twp: 7S 93WFootage: 834 FNL  1863 FWL
Log Types:RPM/CBL/MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 42 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 16, Top: 0 ft., Bottom: 42 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1120 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1120 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10036 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1045, Top: 4894 ft., Bottom: 10036 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3621 ft.
MESAVERDE6170 ft.
CAMEO9068 ft.
ROLLINS9869 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 3/1/2014                  Interval Top: 7969 ft.    Interval Bottom: 9595 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/3/2013Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/2/2013Treatment End Date:11/7/2013
Treatment Summary:1502 Gals 7 ½% HCL; 681400 # 40/70 Sand: 19179 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):19214Max pressure during treatment (psi):6239
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):35Min frac gradient (psi/ft):0.66
Recycled water used in treatment (bbls):19179Total flowback volume recovered (bbls):9871
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):681400Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9404 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/11/2013Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1140
CALC_MCF_GAS 1394
CASING_PRESS 1864
MCF_GAS 1394
TUBING_PRESS 742
Perforation Data:
Interval Top:7969 ft.# Of Holes:129
Interval Bottom:9595 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)77
Total Gas Produced (MCF)13908
GOR180623
GOR DeterminationMCFE
Average BOE per Day6.772
Average MCFE per Day39.296

 Federal Financial Assurance  i Y

 Tribal Well  i No