|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 10/13/2014 Measured TD: 10435 ft. Vertical TD: 10040 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 10/13/2014 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/25/2014 | | Proposed Top PZ Location: | Sec:32 Twp: 6S 93W | Footage: 1130 FSL 647 FWL | | Bottom Hole Location: | Sec:32 Twp: 6S 93W | Footage: 1130 FSL 647 FWL | | Proposed Depth/Form: | 10438 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 139-47 , Unit Acreage: 640, Drill Unit: All | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48# , Citings Type: PLANNED | | Cement: | Sacks: 25, Top: 0 ft., Bottom: 60 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1124 ft., Weight: 32.3# , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 1124 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10438 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 987, Top: , Bottom: 10438 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/26/2014 | | Spud Date: | 5/10/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 10435 ft. | Measured PB depth: | 10376 ft. | | True Vertical TD: | 10040 ft. | True Vertical PB depth: | 9982 ft. | | Top PZ Location: | Sec:32 Twp: 6S 93W | Footage: 1129 FSL 665 FWL | | Bottom Hole Location: | Sec:32 Twp: 6S 93W | Footage: 1094 FSL 630 FWL | | Log Types: | RPM CBL MUDLOGS | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 63 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 24, Top: 0 ft., Bottom: 63 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1153 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 290, Top: 0 ft., Bottom: 1153 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10425 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1100, Top: 5183 ft., Bottom: 10425 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 3830 ft. | | | | | MESAVERDE | 6542 ft. | | | | | CAMEO | 9434 ft. | | | | | ROLLINS | 10271 ft. | | | |
Formation WFCM Formation Classification: OW Status: PR - 10/13/2014 Interval Top: 8116 ft. Interval Bottom: 10154 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 7/4/2014 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/30/2014 | Treatment End Date: | 7/7/2014 | | Treatment Summary: | 13 STAGES: 2225 Gals 7 ½% HCL; 2090200 # 40/70 Sand: 56255 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 56308 | Max pressure during treatment (psi): | 6107 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 13 | | Total acid used in treatment (bbls): | 53 | Min frac gradient (psi/ft): | 0.65 | | Recycled water used in treatment (bbls): | 56255 | Total flowback volume recovered (bbls): | 11610 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 2090200 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9940 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/19/2014 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1139 | | CALC_MCF_GAS | 465 | | CASING_PRESS | 2817 | | MCF_GAS | 465 | | TUBING_PRESS | 1811 |
| | Perforation Data: | | Interval Top: | 8116 ft. | # Of Holes: | 273 | | Interval Bottom: | 10154 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 201 |
| Total Gas Produced (MCF) | 36203 |
| GOR | 180114 |
| GOR Determination | MCFE |
| Average BOE per Day | 17.654 |
| Average MCFE per Day | 102.391 |
| Federal Financial Assurance | i | Y |
|
|