Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-21792
Well Classification: GW Status: PR - 11/9/2014
Well Name/No:Federal #NER 324-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC41916
Facility Status:PRStatus Date11/9/2014
FacilityID:430864LocationID:383328
County:GARFIELD #045Location:LOT 2 5 7S93W 6
Field:RULISON - #75400Elevation:7602 ft.
Basin:PICEANCE BASIN  
Planned Location:127FNL  2575 FWLLat/Long: 39.475008 / -107.798903Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.475008 / -107.798902Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/24/2014
End Date: 9/29/2014
Reported: 11/28/2014
Days to report: 60
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/9/2014             Measured TD: 10213 ft.    Vertical TD: 10082 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/9/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/25/2014
Proposed Top PZ Location:Sec:32 Twp: 6S 93W Footage: 1061 FSL  2023 FWL
Bottom Hole Location:Sec:32 Twp: 6S 93W Footage: 1061 FSL  2023 FWL
Proposed Depth/Form:10192 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-47 , Unit Acreage: 640, Drill Unit: All
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1114 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 294, Top: 0 ft., Bottom: 1114 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10192 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 986, Top: , Bottom: 10192 ft.

Wellbore Completed
Completion Date:7/30/2014
Spud Date:7/21/2014Spud Date Is:ACTUAL
Measured TD:10213 ft.Measured PB depth:10140 ft.
True Vertical TD:10082 ft.True Vertical PB depth:10009 ft.
Top PZ Location:Sec:32 Twp: 6S 93WFootage: 1089 FSL  2039 FWL
Bottom Hole Location:Sec:32 Twp: 6S 93WFootage: 1043 FSL  2016 FWL
Log Types:RPM CBL MUDLOGS
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 63 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 24, Top: 0 ft., Bottom: 63 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1133 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 1133 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10206 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1045, Top: 4076 ft., Bottom: 10206 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3691 ft.N
MESAVERDE6313 ft.N
CAMEO9205 ft.N
ROLLINS10063 ft.N

Formation WFCMC                   Formation Classification:  OW                   Status:  PR - 11/9/2014                 Interval Top: 8060 ft.    Interval Bottom: 9938 ft.

 Completed Information for Formation WILLIAMS FORK-CAMEO COAL
1st Production Date:9/25/2014Choke Size: 
Formation Name:WILLIAMS FORK-CAMEO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/24/2014Treatment End Date:9/29/2014
Treatment Summary:11 STAGES; 2145 Gals 7 ½% HCL; 1811400 # 40/70 Sand: 48743 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):48794Max pressure during treatment (psi):6897
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:11
Total acid used in treatment (bbls):51Min frac gradient (psi/ft):0.68
Recycled water used in treatment (bbls):48743Total flowback volume recovered (bbls):20257
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1811400Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9736 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/9/2014Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1139
CALC_MCF_GAS 646
CASING_PRESS 2300
MCF_GAS 646
TUBING_PRESS 1683
Perforation Data:
Interval Top:8060 ft.# Of Holes:263
Interval Bottom:9938 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)125
Total Gas Produced (MCF)22608
GOR180864
GOR DeterminationMCFE
Average BOE per Day11.024
Average MCFE per Day63.939

 Federal Financial Assurance  i Y

 Tribal Well  i No