Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-21774
Well Classification: GW Status: PR - 8/12/2014
Well Name/No:Federal #NER 314-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC41916
Facility Status:PRStatus Date8/12/2014
FacilityID:430844LocationID:383328
County:GARFIELD #045Location:LOT 2 5 7S93W 6
Field:RULISON - #75400Elevation:7602 ft.
Basin:PICEANCE BASIN  
Planned Location:178FNL  2591 FWLLat/Long: 39.474870 / -107.798848Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.474870 / -107.798848Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/3/2014
End Date: 6/6/2014
Reported: 7/23/2014
Days to report: 47
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/12/2014             Measured TD: 10358 ft.    Vertical TD: 10007 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/12/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/25/2014
Proposed Top PZ Location:Sec:32 Twp: 6S 93W Footage: 810 FSL  645 FWL
Bottom Hole Location:Sec:32 Twp: 6S 93W Footage: 810 FSL  645 FWL
Proposed Depth/Form:10378 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-47 , Unit Acreage: 640, Drill Unit: All
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1132 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 298, Top: 0 ft., Bottom: 1132 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10378 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 983, Top: , Bottom: 10378 ft.

Wellbore Completed
Completion Date:4/10/2014
Spud Date:4/1/2014Spud Date Is:ACTUAL
Measured TD:10358 ft.Measured PB depth:10314 ft.
True Vertical TD:10007 ft.True Vertical PB depth:9963 ft.
Top PZ Location:Sec:32 Twp: 6S 93WFootage: 810 FSL  664 FWL
Bottom Hole Location:Sec:32 Twp: 6S 93WFootage: 807 FSL  658 FWL
Log Types:RPM CBL MUDLOGS
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 42 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 16, Top: 0 ft., Bottom: 42 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1168 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 305, Top: 0 ft., Bottom: 1168 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10347 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1055, Top: 5565 ft., Bottom: 10347 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3792 ft.
MESAVERDE6487 ft.
CAMEO9378 ft.
ROLLINS10213 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 6/24/2014                 Interval Top: 8215 ft.    Interval Bottom: 10058 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/3/2014Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/3/2014Treatment End Date:6/6/2014
Treatment Summary:6 STAGES; 1494 Gals 7 ½% HCL; 710400 # 40/70 Sand: 19854 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):19889Max pressure during treatment (psi):5206
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):35Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):19854Total flowback volume recovered (bbls):11670
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):710400Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9863 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/24/2014Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1099
CALC_MCF_GAS 851
CASING_PRESS 2077
MCF_GAS 851
TUBING_PRESS 1602
Perforation Data:
Interval Top:8215 ft.# Of Holes:138
Interval Bottom:10058 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)127
Total Gas Produced (MCF)22832
GOR179779
GOR DeterminationMCFE
Average BOE per Day11.139
Average MCFE per Day64.581

 Federal Financial Assurance  i Y

 Tribal Well  i No