|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 2/12/2014 Measured TD: 10218 ft. Vertical TD: 9907 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 2/12/2014 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/25/2014 | | Proposed Top PZ Location: | Sec:5 Twp: 7S 93W | Footage: 871 FNL 693 FWL | | Bottom Hole Location: | Sec:5 Twp: 7S 93W | Footage: 871 FNL 693 FWL | | Proposed Depth/Form: | 10253 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 139-76 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48# , Citings Type: PLANNED | | Cement: | Sacks: 25, Top: 0 ft., Bottom: 60 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1131 ft., Weight: 32.3# , Citings Type: PLANNED | | Cement: | Sacks: 298, Top: 0 ft., Bottom: 1131 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10253 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 973, Top: , Bottom: 10253 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/13/2013 | | Spud Date: | 12/2/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 10218 ft. | Measured PB depth: | 10157 ft. | | True Vertical TD: | 9907 ft. | True Vertical PB depth: | 9846 ft. | | Top PZ Location: | Sec:5 Twp: 7S 93W | Footage: 857 FNL 717 FWL | | Bottom Hole Location: | Sec:5 Twp: 7S 93W | Footage: 874 FNL 687 FWL | | Log Types: | RPM/CBL/MUDLOGS
**LOGS ARE INCLUDED IN THIS WELL COMPLETION REPORT. | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 42 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 16, Top: 0 ft., Bottom: 42 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1162 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 1162 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10207 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1020, Top: 5958 ft., Bottom: 10207 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 3757 ft. | | | | | MESAVERDE | 6411 ft. | | | | | CAMEO | 9277 ft. | | | | | ROLLINS | 10084 ft. | | | |
Formation WFCM Formation Classification: OW Status: PR - 2/12/2014 Interval Top: 7830 ft. Interval Bottom: 9939 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 1/24/2014 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 1/24/2014 | Treatment End Date: | 1/27/2014 | | Treatment Summary: | 1321 Gals 7 ½% HCL; 927100# 40/70 Sand: 25824 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 25856 | Max pressure during treatment (psi): | 6559 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 7 | | Total acid used in treatment (bbls): | 31 | Min frac gradient (psi/ft): | 0.66 | | Recycled water used in treatment (bbls): | 25824 | Total flowback volume recovered (bbls): | 8614 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 927100 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/12/2014 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1090 | | CALC_MCF_GAS | 584 | | CASING_PRESS | 2350 | | MCF_GAS | 584 | | TUBING_PRESS | 670 |
| | Perforation Data: | | Interval Top: | 7830 ft. | # Of Holes: | 158 | | Interval Bottom: | 9939 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 154 |
| Total Gas Produced (MCF) | 28061 |
| GOR | 182214 |
| GOR Determination | MCFE |
| Average BOE per Day | 13.679 |
| Average MCFE per Day | 79.339 |
| Federal Financial Assurance | i | Y |
|
|