Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-21769
Well Classification: GW Status: PR - 2/12/2014
Well Name/No:Federal #RU 13-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC41916
Facility Status:PRStatus Date2/12/2014
FacilityID:430839LocationID:383328
County:GARFIELD #045Location:LOT 2 5 7S93W 6
Field:RULISON - #75400Elevation:7602 ft.
Basin:PICEANCE BASIN  
Planned Location:228FNL  2606 FWLLat/Long: 39.474732 / -107.798794Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.474732 / -107.798794Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/24/2014
End Date: 1/27/2014
Reported: 3/14/2014
Days to report: 46
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/12/2014             Measured TD: 10290 ft.    Vertical TD: 9901 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/12/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/25/2014
Proposed Top PZ Location:Sec:5 Twp: 7S 93W Footage: 1242 FNL  575 FWL
Bottom Hole Location:Sec:5 Twp: 7S 93W Footage: 1242 FNL  575 FWL
Proposed Depth/Form:10318 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-79 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1141 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 301, Top: 0 ft., Bottom: 1141 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10318 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 971, Top: , Bottom: 10318 ft.

Wellbore Completed
Completion Date:12/2/2013
Spud Date:11/22/2013Spud Date Is:ACTUAL
Measured TD:10290 ft.Measured PB depth:10214 ft.
True Vertical TD:9901 ft.True Vertical PB depth:9825 ft.
Top PZ Location:Sec:5 Twp: 7S 93WFootage: 1242 FNL  594 FWL
Bottom Hole Location:Sec:5 Twp: 7S 93WFootage: 1275 FNL  579 FWL
Log Types:RPM/CBL/MUDLOGS LOGS ARE ATTACHED TO THIS WELL COMPLETION REPORT
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 63 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 24, Top: 0 ft., Bottom: 63 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1188 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1188 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10278 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1040, Top: 6042 ft., Bottom: 10278 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3792 ft.
MESAVERDE6468 ft.
CAMEO9352 ft.
ROLLINS10138 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 2/12/2014                 Interval Top: 8203 ft.    Interval Bottom: 9989 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/24/2014Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/24/2014Treatment End Date:1/27/2014
Treatment Summary:1429 Gals 7 ½% HCL; 864600# 40/70 Sand: 23711 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):23745Max pressure during treatment (psi):5562
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):34Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):23711Total flowback volume recovered (bbls):9550
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):864600Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9803 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/12/2014Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1128
CALC_MCF_GAS 1370
CASING_PRESS 2555
MCF_GAS 1370
TUBING_PRESS 746
Perforation Data:
Interval Top:8203 ft.# Of Holes:138
Interval Bottom:9989 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)170
Total Gas Produced (MCF)30413
GOR178900
GOR DeterminationMCFE
Average BOE per Day14.834
Average MCFE per Day86.037

 Federal Financial Assurance  i Y

 Tribal Well  i No