Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-21744
Well Classification: GW Status: PR - 6/4/2013
Well Name/No:Shideler Fee #6-6D (O31E)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/4/2013
FacilityID:430561LocationID:334156
County:GARFIELD #045Location:SWSE 31 7S92W 6
Field:MAMM CREEK - #52500Elevation:7107 ft.
Basin:PICEANCE BASIN  
Planned Location:190FSL  2036 FELLat/Long: 39.396305 / -107.706169Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.396298 / -107.706182Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/28/2013
End Date: 4/4/2013
Reported: 6/26/2013
Days to report: 83
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/4/2013             Measured TD: 8970 ft.    Vertical TD: 8563 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/4/2013
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/23/2014
Proposed Top PZ Location:Sec:6 Twp: 8S 92W Footage: 2059 FNL  2295 FEL
Bottom Hole Location:Sec:6 Twp: 8S 92W Footage: 2059 FNL  2295 FEL
Proposed Depth/Form:9030 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit:Hunter Mesa Unit Number:COC055972X
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: Linepipe , Citings Type: PLANNED
Cement:Sacks: 5, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1095 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 352, Top: 0 ft., Bottom: 1095 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9030 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 485, Top: 0 ft., Bottom: 9030 ft.

Wellbore Completed
Completion Date:12/27/2012
Spud Date:11/29/2012Spud Date Is:ACTUAL
Measured TD:8970 ft.Measured PB depth:8879 ft.
True Vertical TD:8563 ft.True Vertical PB depth:8427 ft.
Top PZ Location:Sec:6 Twp: 8S 92WFootage: 1959 FNL  2402 FEL
Bottom Hole Location:Sec:6 Twp: 8S 92WFootage: 2009 FNL  2386 FEL
Log Types:Mud log, RST & CBL.
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 82 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 114, Top: 0 ft., Bottom: 82 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1133 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 0 ft., Bottom: 1133 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8929 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 866, Top: 5350 ft., Bottom: 8929 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK5183 ft.8794 ft.

Formation WMFK                     Formation Classification:  OW                     Status:  PR - 5/1/2013                  Interval Top: 6766 ft.    Interval Bottom: 8513 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:4/24/2013Choke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/28/2013Treatment End Date:4/4/2013
Treatment Summary:Stage 1 - 3 treated with a total of 84,642 bbls of slickwater (BWS).
Total fluid used in treatment (bbls):84642Max pressure during treatment (psi):5611
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:3
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.62
Recycled water used in treatment (bbls):84642Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7928 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/1/2013Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 31
BTU_GAS 1170
CALC_BBLS_H2O 787
CALC_MCF_GAS 1828
CASING_PRESS 1210
MCF_GAS 65
TUBING_PRESS 2060
Perforation Data:
Interval Top:6766 ft.# Of Holes:162
Interval Bottom:8513 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)48
Total Gas Produced (MCF)29715
GOR619062
GOR DeterminationMCFE
Average BOE per Day14.179
Average MCFE per Day82.224

 Federal Financial Assurance  i Y

 Tribal Well  i No