Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-21743
Well Classification: GW Status: PR - 3/1/2014
Well Name/No:Shideler Fee #6-3D (O31E)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2014
FacilityID:430560LocationID:334156
County:GARFIELD #045Location:SWSE 31 7S92W 6
Field:MAMM CREEK - #52500Elevation:7107 ft.
Basin:PICEANCE BASIN  
Planned Location:184FSL  2059 FELLat/Long: 39.396290 / -107.706252Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.396281 / -107.706263Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/27/2013
End Date: 4/6/2013
Reported: 6/26/2013
Days to report: 81
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/1/2014             Measured TD: 8678 ft.    Vertical TD: 8583 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/1/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/23/2014
Proposed Top PZ Location:Sec:6 Twp: 8S 92W Footage: 787 FNL  2387 FEL
Bottom Hole Location:Sec:6 Twp: 8S 92W Footage: 787 FNL  2387 FEL
Proposed Depth/Form:8710 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit:Hunter Mesa Unit Number:COC055972X
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: Linepipe , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1008 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 329, Top: 0 ft., Bottom: 1008 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8710 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 495, Top: 0 ft., Bottom: 8710 ft.

Wellbore Completed
Completion Date:1/15/2013
Spud Date:11/26/2012Spud Date Is:ACTUAL
Measured TD:8678 ft.Measured PB depth:8521 ft.
True Vertical TD:8583 ft.True Vertical PB depth:8426 ft.
Top PZ Location:Sec:6 Twp: 8S 92WFootage: 773 FNL  2493 FEL
Bottom Hole Location:Sec:6 Twp: 8S 92WFootage: 792 FNL  2503 FEL
Log Types:RST,CBL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 82 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 114, Top: 0 ft., Bottom: 82 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1039 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 344, Top: 0 ft., Bottom: 1039 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8660 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 943, Top: 5000 ft., Bottom: 8678 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK4927 ft.8421 ft.

Formation WMFK                     Formation Classification:  OW                     Status:  PR - 3/1/2014                  Interval Top: 6406 ft.    Interval Bottom: 8301 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/27/2013Treatment End Date:4/6/2013
Treatment Summary:STAGES 1-3 TREATED WITH A TOTAL OF: 88,932 BBLS SLICKWATER
Total fluid used in treatment (bbls):88932Max pressure during treatment (psi):5394
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:3
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.63
Recycled water used in treatment (bbls):88932Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WMFK.
Perforation Data:
Interval Top:6406 ft.# Of Holes:162
Interval Bottom:8301 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)75
Total Gas Produced (MCF)43696
GOR582613
GOR DeterminationMCFE
Average BOE per Day20.851
Average MCFE per Day120.918

 Federal Financial Assurance  i Y

 Tribal Well  i No