Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-21736
Well Classification: GW Status: PR - 7/31/2013
Well Name/No:Shideler Fee #31-13C (O31E)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/31/2013
FacilityID:430553LocationID:334156
County:GARFIELD #045Location:SWSE 31 7S92W 6
Field:MAMM CREEK - #52500Elevation:7107 ft.
Basin:PICEANCE BASIN  
Planned Location:208FSL  2021 FELLat/Long: 39.396357 / -107.706118Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.396348 / -107.706132Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/25/2013
End Date: 4/12/2013
Reported: 6/26/2013
Days to report: 75
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/31/2013             Measured TD: 9118 ft.    Vertical TD: 8708 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/31/2013
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/23/2014
Proposed Top PZ Location:Sec:31 Twp: 7S 92W Footage: 538 FSL  38 FWL
Bottom Hole Location:Sec:31 Twp: 7S 92W Footage: 538 FSL  38 FWL
Proposed Depth/Form:9136 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit:Hunter Mesa Unit Number:COC055972X
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: Linepipe , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1187 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 377, Top: 0 ft., Bottom: 1187 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9127 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 503, Top: 0 ft., Bottom: 9127 ft.

Wellbore Completed
Completion Date:12/10/2012
Spud Date:12/2/2012Spud Date Is:ACTUAL
Measured TD:9118 ft.Measured PB depth:9049 ft.
True Vertical TD:8708 ft.True Vertical PB depth:8640 ft.
Top PZ Location:Sec:31 Twp: 7S 92WFootage: 527 FSL  52 FWL
Bottom Hole Location:Sec:31 Twp: 7S 92WFootage: 533 FSL  48 FWL
Log Types:CBL, mudlog, RST
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 114, Top: 0 ft., Bottom: 60 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1358 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 435, Top: 0 ft., Bottom: 1358 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.75 in., Top: 0 ft., Depth: 9098 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 890, Top: 5460 ft., Bottom: 9118 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK5956 ft.8924 ft.

Formation WMFK                     Formation Classification:  OW                     Status:  PR - 3/1/2014                  Interval Top: 7012 ft.    Interval Bottom: 8747 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/20/2013Treatment End Date:4/12/2013
Treatment Summary:Stage 1 - Stage 6 treated with a total of 85,999 bbls of Slickwater (BWS).
Total fluid used in treatment (bbls):85999Max pressure during treatment (psi):5795
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.63
Recycled water used in treatment (bbls):85999Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7966 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WMFK.
Perforation Data:
Interval Top:7012 ft.# Of Holes:162
Interval Bottom:8747 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)82
Total Gas Produced (MCF)48403
GOR590280
GOR DeterminationMCFE
Average BOE per Day23.097
Average MCFE per Day133.951

 Federal Financial Assurance  i Y

 Tribal Well  i No