|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 6/1/2025 Measured TD: 8309 ft. Vertical TD: 8227 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 6/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/8/2014 | | Proposed Top PZ Location: | Sec:31 Twp: 7S 92W | Footage: 2180 FNL 1886 FWL | | Bottom Hole Location: | Sec:31 Twp: 7S 92W | Footage: 2180 FNL 1886 FWL | | Proposed Depth/Form: | 8430 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | Hunter Mesa | Unit Number: | COC055972X | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 16 in., Size: 20 in., Top: 0 ft., Depth: 40 ft., Weight: Linepipe , Citings Type: PLANNED | | Cement: | Sacks: 5, Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 461, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8430 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 561, Top: 0 ft., Bottom: 8430 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/23/2012 | | Spud Date: | 8/23/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8309 ft. | Measured PB depth: | 8231 ft. | | True Vertical TD: | 8227 ft. | True Vertical PB depth: | 8149 ft. | | Top PZ Location: | Sec:31 Twp: 7S 92W | Footage: 2175 FNL 1869 FWL | | Bottom Hole Location: | Sec:31 Twp: 7S 92W | Footage: 2162 FNL 1901 FWL | | Log Types: | RST, CBL (included in Neutron Log) and Mud. | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 40, Top: 22 ft., Bottom: 40 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1531 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 479, Top: 22 ft., Bottom: 1531 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8293 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 910, Top: 4050 ft., Bottom: 8309 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | MESAVERDE | 4684 ft. | 5393 ft. | N | N | | WILLIAMS FORK | 5394 ft. | 8143 ft. | N | N | | ROLLINS | 8144 ft. | 8309 ft. | N | N |
Formation WMFK Formation Classification: OW Status: SI - 6/1/2025 Interval Top: 6078 ft. Interval Bottom: 8089 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 2/20/2013 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 1/1/2013 | Treatment End Date: | 1/23/2013 | | Treatment Summary: | Stages 1-7 treated with a total of: 79,571 bbls of Slickwater. | | Total fluid used in treatment (bbls): | 79571 | Max pressure during treatment (psi): | 5989 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.40 | | Type Of gas: | | Number Of staged intervals: | 7 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.76 | | Recycled water used in treatment (bbls): | 79571 | Total flowback volume recovered (bbls): | 43802 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 0 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7435 ft. | | Tubing Packer Depth: | 0 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/20/2013 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 802 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 802 | | CALC_MCF_GAS | 1182 | | CASING_PRESS | 1926 | | MCF_GAS | 1182 | | TUBING_PRESS | 1206 |
| | Perforation Data: | | Interval Top: | 6078 ft. | # Of Holes: | 189 | | Interval Bottom: | 8089 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 10 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.005 |
| Average MCFE per Day | 0.027 |
| Federal Financial Assurance | i | Y |
|
|