Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-21608
Well Classification: GW Status: PR - 7/5/2013
Well Name/No:MCU #26-4A (I27W)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC69616
Facility Status:PRStatus Date7/5/2013
FacilityID:429482LocationID:324383
County:GARFIELD #045Location:NESE 27 7S93W 6
Field:MAMM CREEK - #52500Elevation:7201 ft.
Basin:PICEANCE BASIN  
Planned Location:1967FSL  516 FELLat/Long: 39.415579 / -107.752932Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.415575 / -107.752924Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/1/2013
End Date: 6/17/2013
Reported: 8/1/2013
Days to report: 45
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/5/2013             Measured TD: 10868 ft.    Vertical TD: 10288 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/5/2013
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:6/28/2014
Proposed Top PZ Location:Sec:26 Twp: 7S 93W Footage: 729 FNL  928 FWL
Bottom Hole Location:Sec:26 Twp: 7S 93W Footage: 689 FNL  956 FWL
Proposed Depth/Form:11067 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:MIDDLETON CREEK Unit Number:COC068997X
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 40 ft., Weight: LINEPIPE , Citings Type: PLANNED
Cement:Sacks: 5, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1658 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 503, Top: 0 ft., Bottom: 1658 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 11067 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1013, Top: 5796 ft., Bottom: 11067 ft.

Wellbore Completed
Completion Date:1/14/2013
Spud Date:9/23/2012Spud Date Is:ACTUAL
Measured TD:10868 ft.Measured PB depth:10800 ft.
True Vertical TD:10288 ft.True Vertical PB depth:10220 ft.
Top PZ Location:Sec:26 Twp: 7S 93WFootage: 729 FNL  928 FWL
Bottom Hole Location:Sec:26 Twp: 7S 93WFootage: 689 FNL  956 FWL
Log Types:RST, CBL, Temperature, Mud logs
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 114, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1687 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 522, Top: 0 ft., Bottom: 1687 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 10846 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1061, Top: 6670 ft., Bottom: 10851 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6823 ft.9580 ft.
COZZETTE10111 ft.10328 ft.
CORCORAN10329 ft.10868 ft.

Formation CRCRN                   Formation Classification:  OW                   Status:  PR - 7/5/2013                  Interval Top: 10354 ft.    Interval Bottom: 10493 ft.

 Completed Information for Formation CORCORAN
1st Production Date:7/4/2013Choke Size: 
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/1/2013Treatment End Date:6/1/2013
Treatment Summary:Stage 1 (Through Stage 1) treated with a total of: 10,286 bbls of Slickwater (BWS).
Total fluid used in treatment (bbls):10286Max pressure during treatment (psi):390
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.73
Recycled water used in treatment (bbls):10286Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):0Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8984 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/5/2013Test Method:Flows from well
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1050
BTU_GAS 1170
CALC_BBLS_H2O 1050
CALC_MCF_GAS 1485
CASING_PRESS 2600
MCF_GAS 1485
TUBING_PRESS 1350
Perforation Data:
Interval Top:10354 ft.# Of Holes:3
Interval Bottom:10493 ft.Hole Size:0.38 in.

Formation COZZ                     Formation Classification:  OW                     Status:  PR - 7/5/2013                  Interval Top: 10118 ft.    Interval Bottom: 10285 ft.

 Completed Information for Formation COZZETTE
1st Production Date:7/4/2013Choke Size: 
Formation Name:COZZETTECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/4/2013Treatment End Date:6/4/2013
Treatment Summary:Stage 2 (Through Stage 2) treated with a total of: 10,857 bbls of Slickwater (BWS).
Total fluid used in treatment (bbls):10857Max pressure during treatment (psi):910
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.71
Recycled water used in treatment (bbls):10857Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):0Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8984 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/5/2013Test Method:Flows from well
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1050
BTU_GAS 1170
CALC_BBLS_H2O 1050
CALC_MCF_GAS 1485
CASING_PRESS 2600
MCF_GAS 1485
TUBING_PRESS 1350
Perforation Data:
Interval Top:10118 ft.# Of Holes:27
Interval Bottom:10285 ft.Hole Size:0.38 in.

Formation WMFK                     Formation Classification:  OW                     Status:  PR - 7/5/2013                  Interval Top: 7686 ft.    Interval Bottom: 9495 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:7/4/2013Choke Size: 
Formation Name:WILLIAMS FORKCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/7/2013Treatment End Date:6/17/2013
Treatment Summary:Stage 3 - Stage 8 treated with a total of: 96,501 bbls of Slickwater (BWS).
Total fluid used in treatment (bbls):96501Max pressure during treatment (psi):1251
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.60
Recycled water used in treatment (bbls):96501Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):0Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8984 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/5/2013Test Method:Flows from well
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1050
BTU_GAS 1170
CALC_BBLS_H2O 1050
CALC_MCF_GAS 1485
CASING_PRESS 2600
MCF_GAS 1485
TUBING_PRESS 1350
Perforation Data:
Interval Top:7686 ft.# Of Holes:162
Interval Bottom:9495 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)100
Total Gas Produced (MCF)54874
GOR548740
GOR DeterminationMCFE
Average BOE per Day26.192
Average MCFE per Day151.895

 Federal Financial Assurance  i Y

 Tribal Well  i No