|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 11/1/2025 Measured TD: 11110 ft. Vertical TD: 10976 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 11/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/3/2018 | | Proposed Top PZ Location: | Sec:4 Twp: 5S 96W | Footage: 2187 FNL 1356 FEL | | Bottom Hole Location: | Sec:4 Twp: 5S 96W | Footage: 2235 FNL 1550 FEL | | Proposed Depth/Form: | 13000 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54# , Citings Type: PLANNED | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3000 ft., Weight: 40# , Citings Type: PLANNED | | Cement: | Sacks: 1209, Top: 0 ft., Bottom: 3000 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11090 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 967, Top: 5650 ft., Bottom: 11090 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/8/2018 | | Spud Date: | 8/1/2018 | Spud Date Is: | ACTUAL | | Measured TD: | 11110 ft. | Measured PB depth: | 11043 ft. | | True Vertical TD: | 10976 ft. | True Vertical PB depth: | 10909 ft. | | Top PZ Location: | Sec:4 Twp: 5S 96W | Footage: 2187 FNL 1356 FEL | | Bottom Hole Location: | Sec:4 Twp: 5S 96W | Footage: 2235 FNL 1550 FEL | | Log Types: | CBL, Pulsed Neutron, (Triple Combo on 045-14545). | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54 , Citings Type: ACTUAL | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2999 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1031, Top: 952 ft., Bottom: 2999 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11095 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1177, Top: 3680 ft., Bottom: 11110 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 952 ft., Bottom: 952 ft., Sacks: 335, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREEN RIVER | 0 ft. | | N | N | | WASATCH | 3400 ft. | | N | N | | WASATCH G | 5161 ft. | | N | N | | FORT UNION | 5511 ft. | | N | N | | OHIO CREEK | 7212 ft. | | N | N | | WILLIAMS FORK | 7765 ft. | | N | N | | CAMEO | 10279 ft. | | N | N | | ROLLINS | 10931 ft. | | N | N |
Formation WFOCCM Formation Classification: GW Status: SI - 11/1/2025 Interval Top: 7220 ft. Interval Bottom: 10710 ft.| Completed Information for Formation WILLIAMS FORK-OHIO CREEK-CAMEO | | 1st Production Date: | 1/9/2019 | Choke Size: | | | Formation Name: | WILLIAMS FORK-OHIO CREEK-CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 1/1/2019 | Treatment End Date: | 1/8/2019 | | Treatment Summary: | 15-stage plug-and-perf completion;
271012 total bbls fluid pumped: 270833 bbls recycled water (slickwater) and 179 bbls 7.5% HCl acid;
no proppant used.
| | Total fluid used in treatment (bbls): | 271012 | Max pressure during treatment (psi): | 8568 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 15 | | Total acid used in treatment (bbls): | 179 | Min frac gradient (psi/ft): | 0.57 | | Recycled water used in treatment (bbls): | 270833 | Total flowback volume recovered (bbls): | 22952 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 10126 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/9/2019 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2037 | | BTU_GAS | 1080 | | CALC_BBLS_H2O | 2037 | | CALC_MCF_GAS | 439 | | CASING_PRESS | 559 | | MCF_GAS | 439 |
| | Perforation Data: | | Interval Top: | 7220 ft. | # Of Holes: | 405 | | Interval Bottom: | 10710 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 167 |
| Total Gas Produced (MCF) | 28307 |
| GOR | 169502 |
| GOR Determination | MCFE |
| Average BOE per Day | 13.744 |
| Average MCFE per Day | 79.723 |
| Federal Financial Assurance | i | Y |
|
|