Wellbore #00 Wellbore Classification: GW Status: SI - 8/1/2025 Measured TD: 11186 ft. Vertical TD: 10946 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 8/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 9/18/2020 | | Proposed Top PZ Location: | Sec:4 Twp: 5S 96W | Footage: 1547 FSL 814 FEL | | Bottom Hole Location: | Sec:4 Twp: 5S 96W | Footage: 1533 FSL 924 FEL | | Proposed Depth/Form: | 11161 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 120 ft., Weight: Line Pipe, Citings Type: PLANNED | | Cement: | Sacks: 176, Top: 0 ft., Bottom: 120 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3000 ft., Weight: 40# , Citings Type: PLANNED | | Cement: | Sacks: 1209, Top: 0 ft., Bottom: 3000 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11161 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 980, Top: 5650 ft., Bottom: 11161 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/2/2018 | | Spud Date: | 10/26/2018 | Spud Date Is: | ACTUAL | | Measured TD: | 11186 ft. | Measured PB depth: | 11111 ft. | | True Vertical TD: | 10946 ft. | True Vertical PB depth: | 10871 ft. | | Top PZ Location: | Sec:4 Twp: 5S 96W | Footage: 1547 FSL 814 FEL | | Bottom Hole Location: | Sec:4 Twp: 5S 96W | Footage: 1533 FSL 924 FEL | | Log Types: | CBL, Pulsed Neutron, (Triple Combo on 045-14545). | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54 , Citings Type: ACTUAL | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2961 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1031, Top: 634 ft., Bottom: 2961 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11166 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1192, Top: 3750 ft., Bottom: 11186 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 634 ft., Bottom: 634 ft., Sacks: 223, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREEN RIVER | 0 ft. | | N | N | | WASATCH | 3416 ft. | | N | N | | WASATCH G | 5190 ft. | | N | N | | FORT UNION | 5617 ft. | | N | N | | OHIO CREEK | 7585 ft. | | N | N | | WILLIAMS FORK | 7894 ft. | | N | N | | CAMEO | 10400 ft. | | N | N | | ROLLINS | 11047 ft. | | | |
Formation WF-OC Formation Classification: GW Status: SI - 8/1/2025 Interval Top: 7601 ft. Interval Bottom: 10095 ft.| Completed Information for Formation WILLIAMS FORK-OHIO CREEK | | 1st Production Date: | 5/3/2019 | Choke Size: | | | Formation Name: | WILLIAMS FORK-OHIO CREEK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 3/31/2019 | Treatment End Date: | 4/4/2019 | | Treatment Summary: | 10-stage plug-and-perf completion;
80120 total bbls fluid pumped: 60369 bbls fresh water (slickwater), 19632 bbls recycled water (slickwater) and 119 bbls 7.5% HCl acid;
no proppant used. | | Total fluid used in treatment (bbls): | 80120 | Max pressure during treatment (psi): | 8469 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.41 | | Type Of gas: | | Number Of staged intervals: | 10 | | Total acid used in treatment (bbls): | 119 | Min frac gradient (psi/ft): | 0.62 | | Recycled water used in treatment (bbls): | 60369 | Total flowback volume recovered (bbls): | 367 | | Fresh water used in treatment (bbls): | 19632 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9456 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/3/2019 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 960 | | BTU_GAS | 1040 | | CALC_BBLS_H2O | 960 | | CALC_MCF_GAS | 24 | | CASING_PRESS | 1245 | | MCF_GAS | 24 | | TUBING_PRESS | 1245 |
| | Perforation Data: | | Interval Top: | 7601 ft. | # Of Holes: | 270 | | Interval Bottom: | 10095 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 12 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.005 |
| Average MCFE per Day | 0.032 |
| Federal Financial Assurance | i | |
|
|