|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 11/1/2025 Measured TD: 11102 ft. Vertical TD: 10975 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 11/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/3/2018 | | Proposed Top PZ Location: | Sec:4 Twp: 5S 96W | Footage: 1273 FNL 1197 FEL | | Bottom Hole Location: | Sec:4 Twp: 5S 96W | Footage: 1303 FNL 1280 FEL | | Proposed Depth/Form: | 13000 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54# , Citings Type: PLANNED | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3000 ft., Weight: 40# , Citings Type: PLANNED | | Cement: | Sacks: 1209, Top: 0 ft., Bottom: 3000 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11135 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 975, Top: 5650 ft., Bottom: 11135 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/15/2018 | | Spud Date: | 6/9/2018 | Spud Date Is: | ACTUAL | | Measured TD: | 11102 ft. | Measured PB depth: | 11032 ft. | | True Vertical TD: | 10975 ft. | True Vertical PB depth: | 10905 ft. | | Top PZ Location: | Sec:4 Twp: 5S 96W | Footage: 1284 FNL 1175 FEL | | Bottom Hole Location: | Sec:4 Twp: 5S 96W | Footage: 1365 FNL 1336 FEL | | Log Types: | CBL, Pulsed Neutron, (Triple Combo on 045-14545). | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54 , Citings Type: ACTUAL | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2948 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1031, Top: 1339 ft., Bottom: 2948 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11074 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1187, Top: 4332 ft., Bottom: 11102 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 1339 ft., Bottom: 1339 ft., Sacks: 471, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREEN RIVER | 0 ft. | | N | N | | WASATCH | 3400 ft. | | N | N | | WASATCH G | 5312 ft. | | N | N | | FORT UNION | 5812 ft. | | N | N | | OHIO CREEK | 7509 ft. | | N | N | | WILLIAMS FORK | 7804 ft. | | N | N | | CAMEO | 10130 ft. | | N | N | | ROLLINS | 10928 ft. | | | |
Formation WFCM Formation Classification: GW Status: SI - 11/1/2025 Interval Top: 7870 ft. Interval Bottom: 10868 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 10/23/2018 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/14/2018 | Treatment End Date: | 9/25/2018 | | Treatment Summary: | 13-stage plug-and-perf completion;
234036 total bbls fluid pumped: 233881 bbls recycled water (slickwater) and 155 bbls 7.5% HCl acid;
no proppant used.
| | Total fluid used in treatment (bbls): | 234036 | Max pressure during treatment (psi): | 7719 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 13 | | Total acid used in treatment (bbls): | 155 | Min frac gradient (psi/ft): | 0.61 | | Recycled water used in treatment (bbls): | 233881 | Total flowback volume recovered (bbls): | 51182 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/23/2018 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2336 | | BTU_GAS | 1080 | | CALC_BBLS_H2O | 2336 | | CALC_MCF_GAS | 112 | | CASING_PRESS | 637 | | MCF_GAS | 112 |
| | Perforation Data: | | Interval Top: | 7870 ft. | # Of Holes: | 351 | | Interval Bottom: | 10868 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 2 |
| Total Gas Produced (MCF) | 1814 |
| GOR | 907000 |
| GOR Determination | MCFE |
| Average BOE per Day | 0.847 |
| Average MCFE per Day | 4.911 |
| Federal Financial Assurance | i | |
|
|