|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 10/1/2025 Measured TD: 11343 ft. Vertical TD: 10898 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 10/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 9/18/2020 | | Proposed Top PZ Location: | Sec:4 Twp: 5S 96W | Footage: 1022 FSL 1217 FEL | | Bottom Hole Location: | Sec:4 Twp: 5S 96W | Footage: 992 FSL 1300 FEL | | Proposed Depth/Form: | 11321 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 120 ft., Weight: Line Pipe, Citings Type: PLANNED | | Cement: | Sacks: 176, Top: 0 ft., Bottom: 120 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3000 ft., Weight: 40# , Citings Type: PLANNED | | Cement: | Sacks: 1209, Top: 0 ft., Bottom: 3000 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11321 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 1010, Top: 5650 ft., Bottom: 11321 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/17/2018 | | Spud Date: | 10/10/2018 | Spud Date Is: | ACTUAL | | Measured TD: | 11343 ft. | Measured PB depth: | 11183 ft. | | True Vertical TD: | 10898 ft. | True Vertical PB depth: | 10738 ft. | | Top PZ Location: | Sec:4 Twp: 5S 96W | Footage: 1078 FSL 1197 FEL | | Bottom Hole Location: | Sec:4 Twp: 5S 96W | Footage: 976 FSL 1297 FEL | | Log Types: | CBL, Pulsed Neutron, (Triple Combo on 045-14545). | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54 , Citings Type: ACTUAL | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2990 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 869, Top: 1563 ft., Bottom: 2990 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11324 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1221, Top: 4150 ft., Bottom: 11343 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 1563 ft., Bottom: 1563 ft., Sacks: 550, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREEN RIVER | 0 ft. | | N | N | | WASATCH | 3471 ft. | | N | N | | WASATCH G | 5296 ft. | | N | N | | FORT UNION | 5736 ft. | | N | N | | OHIO CREEK | 7750 ft. | | N | N | | WILLIAMS FORK | 8047 ft. | | N | N | | CAMEO | 10562 ft. | | N | N | | ROLLINS | 11217 ft. | | N | N |
Formation WF-OC Formation Classification: GW Status: PR - 10/1/2025 Interval Top: 7764 ft. Interval Bottom: 10250 ft.| Completed Information for Formation WILLIAMS FORK-OHIO CREEK | | 1st Production Date: | 4/30/2019 | Choke Size: | | | Formation Name: | WILLIAMS FORK-OHIO CREEK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/5/2019 | Treatment End Date: | 4/9/2019 | | Treatment Summary: | 10-stage plug-and-perf completion;
80120 total bbls fluid pumped: 60369 bbls fresh water (slickwater), 19632 bbls recycled water (slickwater) and 119 bbls 7.5% HCl acid;
no proppant used. | | Total fluid used in treatment (bbls): | 80120 | Max pressure during treatment (psi): | 8294 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.41 | | Type Of gas: | | Number Of staged intervals: | 10 | | Total acid used in treatment (bbls): | 119 | Min frac gradient (psi/ft): | 0.68 | | Recycled water used in treatment (bbls): | 60369 | Total flowback volume recovered (bbls): | 12673 | | Fresh water used in treatment (bbls): | 19632 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7740 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/30/2019 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2208 | | BTU_GAS | 1040 | | CALC_BBLS_H2O | 2208 | | CALC_MCF_GAS | 84 | | CASING_PRESS | 1370 | | MCF_GAS | 84 | | TUBING_PRESS | 1436 |
| | Perforation Data: | | Interval Top: | 7764 ft. | # Of Holes: | 270 | | Interval Bottom: | 10250 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 31 |
| Total Gas Produced (MCF) | 4794 |
| GOR | 154645 |
| GOR Determination | MCFE |
| Average BOE per Day | 2.310 |
| Average MCFE per Day | 13.390 |
| Federal Financial Assurance | i | |
|
|