Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-21557
Well Classification: GW Status: PR - 7/1/2024
Well Name/No:N PARACHUTE #UWF07E-03H04596
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2024
FacilityID:429415LocationID:335907
County:GARFIELD #045Location:SENE 4 5S96W 6
Field:GRAND VALLEY - #31290Elevation:8270 ft.
Basin:PICEANCE BASIN  
Planned Location:1851FNL  27 FELLat/Long: 39.646239 / -108.164928Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.646241 / -108.164926Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/20/2018
End Date: 8/26/2018
Reported: 7/24/2019
Days to report: 332
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/1/2024             Measured TD: 11539 ft.    Vertical TD: 11239 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/1/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/9/2018
Proposed Top PZ Location:Sec:3 Twp: 5S 96W Footage: 158 FNL  995 FWL
Bottom Hole Location:Sec:3 Twp: 5S 96W Footage: 158 FNL  995 FWL
Proposed Depth/Form:13000 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54# , Citings Type: PLANNED
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3000 ft., Weight: 40# , Citings Type: PLANNED
Cement:Sacks: 1209, Top: 0 ft., Bottom: 3000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11540 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 1051, Top: 5650 ft., Bottom: 11540 ft.

Wellbore Completed
Completion Date:4/1/2018
Spud Date:3/21/2018Spud Date Is:ACTUAL
Measured TD:11539 ft.Measured PB depth:11469 ft.
True Vertical TD:11239 ft.True Vertical PB depth:11169 ft.
Top PZ Location:Sec:3 Twp: 5S 96WFootage: 139 FNL  1096 FWL
Bottom Hole Location:Sec:3 Twp: 5S 96WFootage: 189 FNL  926 FWL
Log Types:CBL, Pulsed Neutron, (Triple Combo on 045-14545).
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54 , Citings Type: ACTUAL
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2937 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1031, Top: 1438 ft., Bottom: 2937 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11514 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1262, Top: 2535 ft., Bottom: 11539 ft., Determination Method: CBL
Additional Cement:String Type: SURF , Top: 0 ft., Depth: 1438 ft., Bottom: 1438 ft., Sacks: 506, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
GREEN RIVER0 ft.NN
WASATCH3400 ft.NN
WASATCH G5445 ft.NN
FORT UNION5944 ft.NN
OHIO CREEK7873 ft.NN
WILLIAMS FORK8163 ft.NN
CAMEO10568 ft.NN
ROLLINS11416 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/1/2024                  Interval Top: 8234 ft.    Interval Bottom: 11382 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/27/2018Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/20/2018Treatment End Date:8/25/2018
Treatment Summary:13-stage plug-and-perf completion; 234045 total bbls fluid pumped: 233890 bbls recycled water (slickwater) and 155 bbls 7.5% HCl acid; no proppant used.
Total fluid used in treatment (bbls):234045Max pressure during treatment (psi):7871
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:13
Total acid used in treatment (bbls):155Min frac gradient (psi/ft):0.59
Recycled water used in treatment (bbls):233890Total flowback volume recovered (bbls):131998
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/27/2018Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2259
BTU_GAS 1080
CALC_BBLS_H2O 2259
CALC_MCF_GAS 541
CASING_PRESS 976
MCF_GAS 541
Perforation Data:
Interval Top:8234 ft.# Of Holes:351
Interval Bottom:11382 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)540
Total Gas Produced (MCF)99560
GOR184370
GOR DeterminationMCFE
Average BOE per Day48.493
Average MCFE per Day281.271

 Federal Financial Assurance  i 

 Tribal Well  i No