Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-21391
Well Classification: GW Status: PR - 1/31/2015
Well Name/No:AP #324-17-695
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/31/2015
FacilityID:427845LocationID:335116
County:GARFIELD #045Location:NENW 20 6S95W 6
Field:PARACHUTE - #67350Elevation:6909 ft.
Basin:PICEANCE BASIN  
Planned Location:25FNL  2487 FWLLat/Long: 39.517592 / -108.022975Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.517591 / -108.022973Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/11/2014
End Date: 11/21/2014
Reported: 1/20/2015
Days to report: 60
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/31/2015             Measured TD: 9700 ft.    Vertical TD: 9579 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/31/2015
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/2/2016
Proposed Top PZ Location:Sec:17 Twp: 6S 95W Footage: 1211 FSL  2241 FWL
Bottom Hole Location:Sec:17 Twp: 6S 95W Footage: 1211 FSL  2241 FWL
Proposed Depth/Form:9661 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-40 , Unit Acreage: 320, Drill Unit: W/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2537 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 646, Top: 0 ft., Bottom: 2537 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9661 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 828, Top: , Bottom: 9661 ft.

Wellbore Completed
Completion Date:9/3/2014
Spud Date:8/24/2014Spud Date Is:ACTUAL
Measured TD:9700 ft.Measured PB depth:9655 ft.
True Vertical TD:9579 ft.True Vertical PB depth:9535 ft.
Top PZ Location:Sec:17 Twp: 6S 95WFootage: 1210 FSL  2247 FWL
Bottom Hole Location:Sec:17 Twp: 6S 95WFootage: 1192 FSL  2207 FWL
Log Types:RPM CBL MUDLOGS
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 40 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 15, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2541 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 0 ft., Bottom: 2541 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9688 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1030, Top: 5196 ft., Bottom: 9688 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3760 ft.N
MESAVERDE6090 ft.N
CAMEO8719 ft.N
ROLLINS9498 ft.N

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/1/2015                 Interval Top: 7266 ft.    Interval Bottom: 9450 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/3/2014Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/11/2014Treatment End Date:11/21/2014
Treatment Summary:10 STAGES; 752200 # 40/70 Sand: 144495 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):144495Max pressure during treatment (psi):5499
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.63
Recycled water used in treatment (bbls):144495Total flowback volume recovered (bbls):65144
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):752200Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9220 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/31/2015Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1045
CALC_MCF_GAS 1240
CASING_PRESS 2510
MCF_GAS 1240
TUBING_PRESS 1864
Perforation Data:
Interval Top:7266 ft.# Of Holes:228
Interval Bottom:9450 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)185
Total Gas Produced (MCF)69641
GOR376437
GOR DeterminationMCFE
Average BOE per Day33.401
Average MCFE per Day193.745

 Federal Financial Assurance  i 

 Tribal Well  i No