Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-21386
Well Classification: GW Status: PR - 12/8/2014
Well Name/No:AP #322-20-695
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/8/2014
FacilityID:427838LocationID:335116
County:GARFIELD #045Location:NENW 20 6S95W 6
Field:PARACHUTE - #67350Elevation:6909 ft.
Basin:PICEANCE BASIN  
Planned Location:84FNL  2499 FWLLat/Long: 39.517431 / -108.022931Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.517431 / -108.022929Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/3/2014
End Date: 8/8/2014
Reported: 10/2/2014
Days to report: 55
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/8/2014             Measured TD: 9697 ft.    Vertical TD: 9365 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/8/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/2/2016
Proposed Top PZ Location:Sec:20 Twp: 6S 95W Footage: 1695 FNL  1295 FWL
Bottom Hole Location:Sec:20 Twp: 6S 95W Footage: 1695 FNL  1295 FWL
Proposed Depth/Form:9372 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-31 , Unit Acreage: 320, Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2609 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 664, Top: 0 ft., Bottom: 2609 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9372 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 828, Top: , Bottom: 9372 ft.

Wellbore Completed
Completion Date:7/12/2014
Spud Date:6/30/2014Spud Date Is:ACTUAL
Measured TD:9697 ft.Measured PB depth:9597 ft.
True Vertical TD:9365 ft.True Vertical PB depth:9265 ft.
Top PZ Location:Sec:20 Twp: 6S 95WFootage: 1667 FNL  1316 FWL
Bottom Hole Location:Sec:20 Twp: 6S 95WFootage: 1705 FNL  1324 FWL
Log Types:RPM CBL MUDLOGS
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 108 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 40, Top: 0 ft., Bottom: 108 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2627 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 590, Top: 0 ft., Bottom: 2627 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9678 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 980, Top: 5310 ft., Bottom: 9678 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3852 ft.N
MESAVERDE6120 ft.N
CAMEO8857 ft.N
ROLLINS9465 ft.N

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 12/8/2014                 Interval Top: 7480 ft.    Interval Bottom: 9417 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/6/2014Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/3/2014Treatment End Date:8/8/2014
Treatment Summary:7 STAGES; 1044 Gals 7 ½% HCL; 1460201 # 40/70 Sand: 65105 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):65130Max pressure during treatment (psi):4871
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.61
Recycled water used in treatment (bbls):65105Total flowback volume recovered (bbls):41766
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1460201Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9217 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/8/2014Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1041
CALC_MCF_GAS 711
CASING_PRESS 2139
MCF_GAS 711
TUBING_PRESS 1533
Perforation Data:
Interval Top:7480 ft.# Of Holes:149
Interval Bottom:9417 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)108
Total Gas Produced (MCF)50975
GOR471990
GOR DeterminationMCFE
Average BOE per Day24.381
Average MCFE per Day141.410

 Federal Financial Assurance  i 

 Tribal Well  i No