Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-21384
Well Classification: GW Status: PR - 1/2/2015
Well Name/No:AP #323-17-695
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/2/2015
FacilityID:427836LocationID:335116
County:GARFIELD #045Location:NENW 20 6S95W 6
Field:PARACHUTE - #67350Elevation:6909 ft.
Basin:PICEANCE BASIN  
Planned Location:15FNL  2495 FWLLat/Long: 39.517617 / -108.022944Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.517617 / -108.022945Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/12/2014
End Date: 11/22/2014
Reported: 1/20/2015
Days to report: 59
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/2/2015             Measured TD: 10015 ft.    Vertical TD: 9645 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/2/2015
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/2/2016
Proposed Top PZ Location:Sec:17 Twp: 6S 95W Footage: 2268 FSL  2177 FWL
Bottom Hole Location:Sec:17 Twp: 6S 95W Footage: 2268 FSL  2177 FWL
Proposed Depth/Form:10006 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-40 , Unit Acreage: 320, Drill Unit: W/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2625 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 668, Top: 0 ft., Bottom: 2625 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10006 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 828, Top: , Bottom: 10006 ft.

Wellbore Completed
Completion Date:9/25/2014
Spud Date:9/14/2014Spud Date Is:ACTUAL
Measured TD:10015 ft.Measured PB depth:9966 ft.
True Vertical TD:9645 ft.True Vertical PB depth:9596 ft.
Top PZ Location:Sec:17 Twp: 6S 95WFootage: 2153 FSL  2195 FWL
Bottom Hole Location:Sec:17 Twp: 6S 95WFootage: 2292 FSL  2202 FWL
Log Types:RPM CBL MUDLOGS
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 40 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 15, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2668 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 590, Top: 0 ft., Bottom: 2668 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10000 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1005, Top: 5234 ft., Bottom: 10000 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3785 ft.N
MESAVERDE6374 ft.N
CAMEO9139 ft.N
ROLLINS9822 ft.N

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 2/1/2015                  Interval Top: 7210 ft.    Interval Bottom: 9741 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/17/2014Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/12/2014Treatment End Date:11/22/2014
Treatment Summary:11 STAGES; 856500 # 40/70 Sand: 164068 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):164068Max pressure during treatment (psi):6660
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:11
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.60
Recycled water used in treatment (bbls):164068Total flowback volume recovered (bbls):57814
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):856500Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9491 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/1/2015Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1028
CALC_MCF_GAS 1485
CASING_PRESS 2696
MCF_GAS 1485
TUBING_PRESS 2065
Perforation Data:
Interval Top:7210 ft.# Of Holes:256
Interval Bottom:9741 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)279
Total Gas Produced (MCF)114013
GOR408648
GOR DeterminationMCFE
Average BOE per Day54.622
Average MCFE per Day316.815

 Federal Financial Assurance  i 

 Tribal Well  i No