Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-21382
Well Classification: GW Status: PR - 11/11/2014
Well Name/No:AP #321-20-695
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/11/2014
FacilityID:427834LocationID:335116
County:GARFIELD #045Location:NENW 20 6S95W 6
Field:PARACHUTE - #67350Elevation:6909 ft.
Basin:PICEANCE BASIN  
Planned Location:54FNL  2493 FWLLat/Long: 39.517511 / -108.022953Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.517511 / -108.022951Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/26/2014
End Date: 9/12/2014
Reported: 11/11/2014
Days to report: 60
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/11/2014             Measured TD: 9650 ft.    Vertical TD: 9417 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/11/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/2/2016
Proposed Top PZ Location:Sec:20 Twp: 6S 95W Footage: 144 FNL  715 FWL
Bottom Hole Location:Sec:20 Twp: 6S 95W Footage: 144 FNL  715 FWL
Proposed Depth/Form:9734 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-31 , Unit Acreage: 320, Drill Unit: N/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2575 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 656, Top: 0 ft., Bottom: 2575 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9734 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 828, Top: , Bottom: 9734 ft.

Wellbore Completed
Completion Date:8/3/2014
Spud Date:7/24/2014Spud Date Is:ACTUAL
Measured TD:9650 ft.Measured PB depth:9568 ft.
True Vertical TD:9417 ft.True Vertical PB depth:9336 ft.
Top PZ Location:Sec:20 Twp: 6S 95WFootage: 153 FNL  802 FWL
Bottom Hole Location:Sec:20 Twp: 6S 95WFootage: 155 FNL  711 FWL
Log Types:RPM CBL MUDLOGS
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 22, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2587 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 580, Top: 0 ft., Bottom: 2587 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9637 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1005, Top: 4992 ft., Bottom: 9637 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3730 ft.N
MESAVERDE6098 ft.N
CAMEO8957 ft.N
ROLLINS9452 ft.N

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 12/8/2014                 Interval Top: 6886 ft.    Interval Bottom: 9412 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/1/2014Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/26/2014Treatment End Date:9/12/2014
Treatment Summary:9 STAGES; 537 Gals 7 ½% HCL; 1778400 # 40/70 Sand: 68837 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):68850Max pressure during treatment (psi):6727
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:9
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.58
Recycled water used in treatment (bbls):68837Total flowback volume recovered (bbls):30273
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1778400Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9150 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/8/2014Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1062
CALC_MCF_GAS 858
CASING_PRESS 2277
MCF_GAS 858
TUBING_PRESS 1602
Perforation Data:
Interval Top:6886 ft.# Of Holes:197
Interval Bottom:9412 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)117
Total Gas Produced (MCF)54225
GOR463461
GOR DeterminationMCFE
Average BOE per Day25.950
Average MCFE per Day150.511

 Federal Financial Assurance  i 

 Tribal Well  i No