|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/31/2013 Measured TD: 7850 ft. Vertical TD: 7156 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/31/2013 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/10/2013 | | Proposed Top PZ Location: | Sec:9 Twp: 6S 91W | Footage: 1139 FSL 2010 FWL | | Bottom Hole Location: | Sec:9 Twp: 6S 91W | Footage: 1139 FSL 2010 FWL | | Proposed Depth/Form: | 7823 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WFILS , Formation: WILLIAMS FORK-ILES , Order: 513-4 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 70 ft., Weight: 65# , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 70 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1465 ft., Weight: 32.3# , Citings Type: PLANNED | | Cement: | Sacks: 381, Top: 0 ft., Bottom: 1465 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7823 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 721, Top: , Bottom: 7823 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/21/2012 | | Spud Date: | 9/14/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7850 ft. | Measured PB depth: | 7795 ft. | | True Vertical TD: | 7156 ft. | True Vertical PB depth: | 7101 ft. | | Top PZ Location: | Sec:9 Twp: 6S 91W | Footage: 1164 FSL 1975 FWL | | Bottom Hole Location: | Sec:9 Twp: 6S 91W | Footage: 1193 FSL 1981 FWL | | Log Types: | CBL, Mud, and Reservoir Performance Monitor (RPM) | | Log Types: | CBL, Mud, and Reservoir Performance Monitor (RPM) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 68 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 33, Top: 0 ft., Bottom: 68 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 395, Top: 0 ft., Bottom: 1500 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7828 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1145, Top: 5700 ft., Bottom: 7828 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | MESAVERDE | 3834 ft. | | | | | CAMEO | 7341 ft. | | | | | ROLLINS | 7573 ft. | | | |
Formation WFCM Formation Classification: GW Status: PR - 5/31/2013 Interval Top: 6620 ft. Interval Bottom: 7557 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 2/2/2013 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 1/31/2013 | Treatment End Date: | 2/2/2013 | | Treatment Summary: | 2000 Gals 7 1/2% HCL; 59000#30/50 and 44900# 100- Mesh Sand; 17982 Bbls Slickwater; (Summary)
*All flowback water entries are total estimates based on comingled volumes.
| | Total fluid used in treatment (bbls): | 18030 | Max pressure during treatment (psi): | 3568 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 4 | | Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | 0.63 | | Recycled water used in treatment (bbls): | 17982 | Total flowback volume recovered (bbls): | 11289 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 634900 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7295 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/31/2013 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1202 | | CALC_MCF_GAS | 216 | | CASING_PRESS | 860 | | MCF_GAS | 216 | | TUBING_PRESS | 360 |
| | Perforation Data: | | Interval Top: | 6620 ft. | # Of Holes: | 99 | | Interval Bottom: | 7557 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 13 |
| Total Gas Produced (MCF) | 1504 |
| GOR | 115692 |
| GOR Determination | MCFE |
| Average BOE per Day | 0.748 |
| Average MCFE per Day | 4.333 |
| Federal Financial Assurance | i | |
|
|