|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 12/6/2012 Measured TD: 7395 ft. Vertical TD: 7333 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 12/6/2012 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/22/2013 | | Proposed Top PZ Location: | Sec:28 Twp: 7S 95W | Footage: 540 FNL 1678 FWL | | Bottom Hole Location: | Sec:28 Twp: 7S 95W | Footage: 540 FNL 1678 FWL | | Proposed Depth/Form: | 7458 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | COC-128382 | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 440-62 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: PLANNED | | Cement: | Sacks: 118, Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1120 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 301, Top: 0 ft., Bottom: 1120 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7458 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 668, Top: 3924 ft., Bottom: 7458 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/3/2012 | | Spud Date: | 6/9/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7395 ft. | Measured PB depth: | 7321 ft. | | True Vertical TD: | 7333 ft. | True Vertical PB depth: | 7259 ft. | | Top PZ Location: | Sec:28 Twp: 7S 95W | Footage: 531 FNL 1684 FWL | | Bottom Hole Location: | Sec:28 Twp: 7S 95W | Footage: 540 FNL 1663 FWL | | Log Types: | RST, CBL (included in Neutron Log) and Mud. | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 86 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 177, Top: 0 ft., Bottom: 86 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1165 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 382, Top: 0 ft., Bottom: 1165 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7366 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 936, Top: 4200 ft., Bottom: 7395 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | MESAVERDE | 4316 ft. | 4927 ft. | N | N | | WILLIAMS FORK | 4928 ft. | 7208 ft. | N | N | | ROLLINS | 7902 ft. | 7395 ft. | N | N |
Formation WMFK Formation Classification: GW Status: PR - 12/6/2012 Interval Top: 5272 ft. Interval Bottom: 7149 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 11/29/2012 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/5/2012 | Treatment End Date: | 10/14/2012 | | Treatment Summary: | Stages 1-6 Treated with a total of : 108,835 bbls of Slickwater. | | Total fluid used in treatment (bbls): | 108835 | Max pressure during treatment (psi): | 4197 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.50 | | Type Of gas: | | Number Of staged intervals: | 6 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.70 | | Recycled water used in treatment (bbls): | 108835 | Total flowback volume recovered (bbls): | 3299 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 0 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6427 ft. | | Tubing Packer Depth: | 0 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/6/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 474 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 474 | | CALC_MCF_GAS | 1203 | | CASING_PRESS | 1750 | | MCF_GAS | 1203 | | TUBING_PRESS | 850 |
| | Perforation Data: | | Interval Top: | 5272 ft. | # Of Holes: | 162 | | Interval Bottom: | 7149 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 35 |
| Total Gas Produced (MCF) | 24493 |
| GOR | 699800 |
| GOR Determination | MCFE |
| Average BOE per Day | 11.669 |
| Average MCFE per Day | 67.660 |
| Federal Financial Assurance | i | Y |
|
|