|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 2/20/2013 Measured TD: 7520 ft. Vertical TD: 7380 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 2/20/2013 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/16/2013 | | Proposed Top PZ Location: | Sec:28 Twp: 7S 95W | Footage: 716 FNL 2002 FEL | | Bottom Hole Location: | Sec:28 Twp: 7S 95W | Footage: 716 FNL 2002 FEL | | Proposed Depth/Form: | 7569 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | | Unit Number: | COC-128382 | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 440-62 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: PLANNED | | Cement: | Sacks: 118, Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1135 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 305, Top: 0 ft., Bottom: 1135 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7569 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 683, Top: 3980 ft., Bottom: 7569 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/29/2012 | | Spud Date: | 6/11/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7520 ft. | Measured PB depth: | 7387 ft. | | True Vertical TD: | 7380 ft. | True Vertical PB depth: | 7247 ft. | | Top PZ Location: | Sec:28 Twp: 7S 95W | Footage: 702 FNL 1903 FEL | | Bottom Hole Location: | Sec:28 Twp: 7S 95W | Footage: 724 FNL 1891 FEL | | Log Types: | RST, CBL (included in Neutron Log) and Mud. | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 40, Top: 0 ft., Bottom: 40 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 117 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 748, Top: 0 ft., Bottom: 117 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 1190 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 1190 ft., Determination Method: CALC | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 7465 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 322, Top: 4250 ft., Bottom: 7520 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | MESAVERDE | 4393 ft. | 5051 ft. | N | N | | WILLIAMS FORK | 5052 ft. | 7314 ft. | N | N | | ROLLINS | 7315 ft. | 7520 ft. | N | N |
Formation WMFK Formation Classification: OW Status: PR - 12/26/2012 Interval Top: 5312 ft. Interval Bottom: 7281 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 12/19/2012 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/5/2012 | Treatment End Date: | 10/15/2012 | | Treatment Summary: | Stages 1-7 treated with a total of: 112,999 bbls of Slickwater. | | Total fluid used in treatment (bbls): | 112999 | Max pressure during treatment (psi): | 4888 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.50 | | Type Of gas: | | Number Of staged intervals: | 7 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.74 | | Recycled water used in treatment (bbls): | 112999 | Total flowback volume recovered (bbls): | 5350 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 0 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6573 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/26/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 600 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 600 | | CALC_MCF_GAS | 852 | | CASING_PRESS | 2050 | | MCF_GAS | 852 | | TUBING_PRESS | 1140 |
| | Perforation Data: | | Interval Top: | 5312 ft. | # Of Holes: | 189 | | Interval Bottom: | 7281 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 39 |
| Total Gas Produced (MCF) | 26994 |
| GOR | 692153 |
| GOR Determination | MCFE |
| Average BOE per Day | 12.859 |
| Average MCFE per Day | 74.597 |
| Federal Financial Assurance | i | Y |
|
|