|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 12/6/2012 Measured TD: 7510 ft. Vertical TD: 7374 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 12/6/2012 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/16/2013 | | Proposed Top PZ Location: | Sec:28 Twp: 7S 95W | Footage: 203 FNL 1868 FEL | | Bottom Hole Location: | Sec:28 Twp: 7S 95W | Footage: 203 FNL 1868 FEL | | Proposed Depth/Form: | 7568 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | | Unit Number: | COC-128382 | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 440-62 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: PLANNED | | Cement: | Sacks: 118, Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1135 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 305, Top: 0 ft., Bottom: 1135 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7568 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 688, Top: 3967 ft., Bottom: 7568 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/19/2012 | | Spud Date: | 5/6/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7510 ft. | Measured PB depth: | 7433 ft. | | True Vertical TD: | 7374 ft. | True Vertical PB depth: | 7297 ft. | | Top PZ Location: | Sec:28 Twp: 7S 95W | Footage: 183 FNL 1855 FEL | | Bottom Hole Location: | Sec:28 Twp: 7S 95w | Footage: 194 FNL 1863 FEL | | Log Types: | RST, CBL (included in Nuetron Log) and Mud. | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 40, Top: 0 ft., Bottom: 40 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1146 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 385, Top: 0 ft., Bottom: 1146 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 1235 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 5650 ft., Bottom: 1244 ft., Determination Method: CALC | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 7475 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 297, Top: 5540 ft., Bottom: 7510 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 4401 ft., Depth: 5650 ft., Bottom: 5651 ft., Sacks: 200, Method: SQUEEZE | | Additional Cement: | String Type: 2ND , Top: 4401 ft., Depth: 5540 ft., Bottom: 5541 ft., Sacks: 200, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | MESAVERDE | 4401 ft. | 5084 ft. | N | N | | WILLIAMS FORK | 5085 ft. | 7341 ft. | N | N | | ROLLINS | 7342 ft. | 7510 ft. | N | N |
Formation WMFK Formation Classification: OW Status: PR - 10/9/2012 Interval Top: 5560 ft. Interval Bottom: 7291 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 10/2/2012 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/19/2012 | Treatment End Date: | 9/23/2012 | | Treatment Summary: | Stages 1-6 treated with a total of: 62,810 bbls of Slickwater. | | Total fluid used in treatment (bbls): | 62810 | Max pressure during treatment (psi): | 4892 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.50 | | Type Of gas: | | Number Of staged intervals: | 6 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.67 | | Recycled water used in treatment (bbls): | 62810 | Total flowback volume recovered (bbls): | 24481 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 0 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/9/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 591 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 591 | | CALC_MCF_GAS | 511 | | CASING_PRESS | 1030 | | MCF_GAS | 511 |
| | Perforation Data: | | Interval Top: | 5560 ft. | # Of Holes: | 162 | | Interval Bottom: | 7291 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 40 |
| Total Gas Produced (MCF) | 27407 |
| GOR | 685175 |
| GOR Determination | MCFE |
| Average BOE per Day | 13.057 |
| Average MCFE per Day | 75.734 |
| Federal Financial Assurance | i | Y |
|
|