|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 7/1/2024 Measured TD: 9400 ft. Vertical TD: 9164 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 7/1/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/8/2020 | | Proposed Top PZ Location: | Sec:15 Twp: 5S 96W | Footage: 2186 FNL 1529 FEL | | Bottom Hole Location: | Sec:15 Twp: 5S 96W | Footage: 2299 FNL 1757 FEL | | Proposed Depth/Form: | 9349 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54# , Citings Type: PLANNED | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2000 ft., Weight: 36# , Citings Type: PLANNED | | Cement: | Sacks: 562, Top: 0 ft., Bottom: 2000 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9349 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 1154, Top: 2813 ft., Bottom: 9349 ft. | | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 11156 ft., Weight: 12 , Citings Type: PLANNED | | Cement: | Sacks: 532, Top: , Bottom: 11156 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/25/2018 | | Spud Date: | 9/19/2018 | Spud Date Is: | ACTUAL | | Measured TD: | 9400 ft. | Measured PB depth: | 9331 ft. | | True Vertical TD: | 9164 ft. | True Vertical PB depth: | 9095 ft. | | Top PZ Location: | Sec:15 Twp: 5S 96W | Footage: 2186 FNL 1529 FEL | | Bottom Hole Location: | Sec:15 Twp: 5S 96W | Footage: 2299 FNL 1757 FEL | | Log Types: | CBL, Pulsed Neutron, (Triple Combo on 045-21085). | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54 , Citings Type: ACTUAL | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2382 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 678, Top: 0 ft., Bottom: 2382 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9384 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 968, Top: 2745 ft., Bottom: 9384 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREEN RIVER | 0 ft. | | N | N | | WASATCH | 1460 ft. | | N | N | | WASATCH G | 3484 ft. | | N | N | | FORT UNION | 4011 ft. | | N | N | | OHIO CREEK | 5269 ft. | | N | N | | WILLIAMS FORK | 5545 ft. | | N | N | | CAMEO | 8505 ft. | | N | N | | ROLLINS | 9161 ft. | | | |
Formation WFCM Formation Classification: GW Status: PR - 7/1/2024 Interval Top: 5805 ft. Interval Bottom: 8197 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 4/1/2019 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 3/21/2019 | Treatment End Date: | 3/24/2019 | | Treatment Summary: | 10-stage plug-and-perf completion;
81700 total bbls fluid pumped: 35064 bbls fresh water (slickwater), 46517 bbls recycled water (slickwater), and 119 bbls 7.5% HCl acid;
no proppant used. | | Total fluid used in treatment (bbls): | 81700 | Max pressure during treatment (psi): | 8298 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.41 | | Type Of gas: | | Number Of staged intervals: | 10 | | Total acid used in treatment (bbls): | 119 | Min frac gradient (psi/ft): | 0.85 | | Recycled water used in treatment (bbls): | 46517 | Total flowback volume recovered (bbls): | 50653 | | Fresh water used in treatment (bbls): | 35064 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7584 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/1/2019 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4248 | | BTU_GAS | 1050 | | CALC_BBLS_H2O | 4248 | | CALC_MCF_GAS | 115 | | CASING_PRESS | 1400 | | MCF_GAS | 115 | | TUBING_PRESS | 1000 |
| | Perforation Data: | | Interval Top: | 5805 ft. | # Of Holes: | 270 | | Interval Bottom: | 8197 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 232 |
| Total Gas Produced (MCF) | 41832 |
| GOR | 180310 |
| GOR Determination | MCFE |
| Average BOE per Day | 20.396 |
| Average MCFE per Day | 118.308 |
| Federal Financial Assurance | i | |
|
|