Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-21088
Well Classification: GW Status: PR - 7/1/2024
Well Name/No:NPR H15 #22B-10 596
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2024
FacilityID:425830LocationID:425805
County:GARFIELD #045Location:SENE 15 5S96W 6
Field:GRAND VALLEY - #31290Elevation:6428 ft.
Basin:PICEANCE BASIN  
Planned Location:2072FNL  189 FELLat/Long: 39.616647 / -108.146750Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.616647 / -108.146750Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/10/2019
End Date: 3/15/2019
Reported: 7/29/2019
Days to report: 136
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/1/2024             Measured TD: 10039 ft.    Vertical TD: 9202 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/1/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/1/2020
Proposed Top PZ Location:Sec:10 Twp: 5S 96W Footage: 625 FSL  1222 FEL
Bottom Hole Location:Sec:10 Twp: 5S 96W Footage: 595 FSL  1306 FEL
Proposed Depth/Form:10387 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54# , Citings Type: PLANNED
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 36# , Citings Type: PLANNED
Cement:Sacks: 994, Top: 0 ft., Bottom: 2500 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10029 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 1282, Top: 2804 ft., Bottom: 10029 ft.

Wellbore Completed
Completion Date:8/6/2018
Spud Date:7/23/2018Spud Date Is:ACTUAL
Measured TD:10039 ft.Measured PB depth:9966 ft.
True Vertical TD:9202 ft.True Vertical PB depth:9129 ft.
Top PZ Location:Sec:10 Twp: 5S 96WFootage: 659 FSL  1230 FEL
Bottom Hole Location:Sec:10 Twp: 5S 96WFootage: 606 FSL  1415 FEL
Log Types:CBL, Pulsed Neutron, (Triple Combo on 045-21085).
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54 , Citings Type: ACTUAL
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2524 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 705, Top: 0 ft., Bottom: 2524 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10026 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 980, Top: 4900 ft., Bottom: 10026 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREEN RIVER0 ft.NN
WASATCH1654 ft.NN
WASATCH G3853 ft.NN
FORT UNION4442 ft.NN
OHIO CREEK5980 ft.NN
WILLIAMS FORK6272 ft.NN
CAMEO9247 ft.NN
ROLLINS9884 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/1/2024                  Interval Top: 6486 ft.    Interval Bottom: 9827 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/9/2019Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/10/2019Treatment End Date:3/15/2019
Treatment Summary:13-stage plug-and-perf completion; 234000 total bbls fluid pumped: 100139 bbls fresh water (slickwater), 133706 bbls recycled water (slickwater), and 167 bbls 7.5% HCl acid; no proppant used.
Total fluid used in treatment (bbls):234000Max pressure during treatment (psi):8539
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.41
Type Of gas:Number Of staged intervals:13
Total acid used in treatment (bbls):155Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):133706Total flowback volume recovered (bbls):46872
Fresh water used in treatment (bbls):100139Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8984 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/9/2019Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2112
BTU_GAS 1050
CALC_BBLS_H2O 2112
CALC_MCF_GAS 85
CASING_PRESS 1900
MCF_GAS 85
TUBING_PRESS 2275
Perforation Data:
Interval Top:6486 ft.# Of Holes:351
Interval Bottom:9827 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)521
Total Gas Produced (MCF)95763
GOR183806
GOR DeterminationMCFE
Average BOE per Day46.772
Average MCFE per Day271.275

 Federal Financial Assurance  i 

 Tribal Well  i No