Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-21070
Well Classification: GW Status: PR - 7/1/2024
Well Name/No:NPR H15 #13C-14 596
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2024
FacilityID:425812LocationID:425805
County:GARFIELD #045Location:SENE 15 5S96W 6
Field:GRAND VALLEY - #31290Elevation:6429 ft.
Basin:PICEANCE BASIN  
Planned Location:2351FNL  59 FELLat/Long: 39.615881 / -108.146283Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.615879 / -108.146282Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/1/2019
End Date: 3/4/2019
Reported: 7/29/2019
Days to report: 147
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/1/2024             Measured TD: 9495 ft.    Vertical TD: 9294 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/1/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:3/8/2020
Proposed Top PZ Location:Sec:14 Twp: 5S 96W Footage: 2515 FSL  1218 FWL
Bottom Hole Location:Sec:14 Twp: 5S 96W Footage: 2312 FSL  1025 FWL
Proposed Depth/Form:9346 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54# , Citings Type: PLANNED
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2000 ft., Weight: 36# , Citings Type: PLANNED
Cement:Sacks: 562, Top: 0 ft., Bottom: 2000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9478 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 1150, Top: 2963 ft., Bottom: 9478 ft.

Wellbore Completed
Completion Date:11/13/2018
Spud Date:11/7/2018Spud Date Is:ACTUAL
Measured TD:9495 ft.Measured PB depth:9432 ft.
True Vertical TD:9294 ft.True Vertical PB depth:9231 ft.
Top PZ Location:Sec:14 Twp: 5S 96WFootage: 2515 FSL  1218 FWL
Bottom Hole Location:Sec:14 Twp: 5S 96WFootage: 2312 FSL  1025 FWL
Log Types:CBL, Pulsed Neutron, (Triple Combo on 045-21085).
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54 , Citings Type: ACTUAL
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2390 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 678, Top: 0 ft., Bottom: 2390 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9478 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 940, Top: 4240 ft., Bottom: 9478 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREEN RIVER0 ft.NN
WASATCH1629 ft.NN
WASATCH G3411 ft.NN
FORT UNION4063 ft.NN
OHIO CREEK5302 ft.NN
WILLIAMS FORK5578 ft.NN
CAMEO8669 ft.NN
ROLLINS9318 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 7/1/2024                  Interval Top: 5780 ft.    Interval Bottom: 8336 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:3/7/2019Choke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/1/2019Treatment End Date:3/4/2019
Treatment Summary:10-stage plug-and-perf completion; 80118 total bbls fluid pumped: 34258 bbls fresh water (slickwater), 45741 bbls recycled water (slickwater), and 119 bbls 7.5% HCl acid; no proppant used.
Total fluid used in treatment (bbls):80118Max pressure during treatment (psi):7695
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.41
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):119Min frac gradient (psi/ft):0.78
Recycled water used in treatment (bbls):45741Total flowback volume recovered (bbls):43070
Fresh water used in treatment (bbls):34258Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7678 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/7/2019Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2880
BTU_GAS 1050
CALC_BBLS_H2O 2880
CALC_MCF_GAS 114
CASING_PRESS 1365
MCF_GAS 114
Perforation Data:
Interval Top:5780 ft.# Of Holes:270
Interval Bottom:8336 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)129
Total Gas Produced (MCF)25876
GOR200589
GOR DeterminationMCFE
Average BOE per Day12.525
Average MCFE per Day72.630

 Federal Financial Assurance  i 

 Tribal Well  i No