Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-21062
Well Classification: GW Status: PR - 11/13/2012
Well Name/No:Duggan #RWF 42-31
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/13/2012
FacilityID:425267LocationID:324118
County:GARFIELD #045Location:NENW 32 6S94W 6
Field:RULISON - #75400Elevation:5536 ft.
Basin:PICEANCE BASIN  
Planned Location:1095FNL  1287 FWLLat/Long: 39.485689 / -107.915952Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.485689 / -107.915952Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/14/2012
End Date: 9/14/2012
Reported: 11/14/2012
Days to report: 61
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/13/2012             Measured TD: 8223 ft.    Vertical TD: 7931 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/13/2012
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:9/7/2013
Proposed Top PZ Location:Sec:31 Twp: 6S 94W Footage: 1811 FNL  287 FEL
Bottom Hole Location:Sec:31 Twp: 6S 94W Footage: 1811 FNL  287 FEL
Proposed Depth/Form:8337 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFk , Formation: WILLIAMS FORK , Order: 139-83 , Unit Acreage: 320, Drill Unit: N/2 Fee pooled
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1143 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 301, Top: 0 ft., Bottom: 1143 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8337 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 682, Top: 4385 ft., Bottom: 8337 ft.

Wellbore Completed
Completion Date:6/26/2012
Spud Date:6/16/2012Spud Date Is:ACTUAL
Measured TD:8223 ft.Measured PB depth:8192 ft.
True Vertical TD:7931 ft.True Vertical PB depth:7900 ft.
Top PZ Location:Sec:31 Twp: 6S 94WFootage: 1851 FSL  271 FWL
Bottom Hole Location:Sec:31 Twp: 6S 94WFootage: 1860 FSL  272 FWL
Log Types:RPM/CBL/MUDLOGS
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 40 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 15, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1162 ft., Weight: 6536 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1162 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7194 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1360, Top: 4034 ft., Bottom: 7194 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2107 ft.
MESAVERDE4624 ft.
CAMEO7216 ft.
ROLLINS8124 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 10/31/2012                Interval Top: 6058 ft.    Interval Bottom: 7878 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/9/2012Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/6/2012Treatment End Date:9/14/2012
Treatment Summary:2851 Gals 7 ½% HCL; 789100# 30/50 Sand; 329100 100/Mesh; 24612 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):24680Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):67Min frac gradient (psi/ft):0.82
Recycled water used in treatment (bbls):24612Total flowback volume recovered (bbls):12865
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1118500Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7684 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/31/2012Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1084
CALC_MCF_GAS 1062
CASING_PRESS 2134
MCF_GAS 1062
TUBING_PRESS 1993
Perforation Data:
Interval Top:6058 ft.# Of Holes:132
Interval Bottom:7878 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)60
Total Gas Produced (MCF)23560
GOR392666
GOR DeterminationMCFE
Average BOE per Day11.295
Average MCFE per Day65.493

 Federal Financial Assurance  i 

 Tribal Well  i No