|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 11/13/2012 Measured TD: 8384 ft. Vertical TD: 7987 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 11/13/2012 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 9/7/2013 | | Proposed Top PZ Location: | Sec:31 Twp: 6S 94W | Footage: 2480 FNL 177 FEL | | Bottom Hole Location: | Sec:31 Twp: 6S 94W | Footage: 2480 FNL 177 FEL | | Proposed Depth/Form: | 8429 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFk , Formation: WILLIAMS FORK , Order: 139-83 , Unit Acreage: 320, Drill Unit: N/2 Fee Pool | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 45 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1154 ft., Weight: 32.3 , Citings Type: PLANNED | | Cement: | Sacks: 304, Top: 0 ft., Bottom: 1154 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8429 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 676, Top: 4523 ft., Bottom: 8429 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/13/2012 | | Spud Date: | 7/4/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8384 ft. | Measured PB depth: | 8314 ft. | | True Vertical TD: | 7987 ft. | True Vertical PB depth: | 7917 ft. | | Top PZ Location: | Sec:31 Twp: 6S 94W | Footage: 2526 FNL 155 FEL | | Bottom Hole Location: | Sec:31 Twp: 6S 94S | Footage: 2527 FNL 158 FEL | | Log Types: | RPM/CBL/MUDLOGS | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 61 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 23, Top: 0 ft., Bottom: 61 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1195 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 1195 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8360 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1385, Top: 3460 ft., Bottom: 8360 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 2149 ft. | | | | | MESAVERDE | 4722 ft. | | | | | CAMEO | 7307 ft. | | | | | ROLLINS | 8261 ft. | | | |
Formation WFCM Formation Classification: OW Status: PR - 10/31/2012 Interval Top: 6193 ft. Interval Bottom: 8101 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 9/8/2012 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/6/2012 | Treatment End Date: | 9/14/2012 | | Treatment Summary: | 2971 Gals 7 ½% HCL; 707600 # 30/50 Sand; 166300 100/Mesh; 22729 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 22800 | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 6 | | Total acid used in treatment (bbls): | 70 | Min frac gradient (psi/ft): | 0.78 | | Recycled water used in treatment (bbls): | 22729 | Total flowback volume recovered (bbls): | 8701 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 873900 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7879 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/31/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1080 | | CALC_MCF_GAS | 662 | | CASING_PRESS | 1751 | | MCF_GAS | 662 | | TUBING_PRESS | 1428 |
| | Perforation Data: | | Interval Top: | 6193 ft. | # Of Holes: | 132 | | Interval Bottom: | 8101 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 52 |
| Total Gas Produced (MCF) | 21391 |
| GOR | 411365 |
| GOR Determination | MCFE |
| Average BOE per Day | 10.251 |
| Average MCFE per Day | 59.453 |
| Federal Financial Assurance | i | |
|
|