Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-20900
Well Classification: GW Status: PR - 3/26/2013
Well Name/No:Diamond Elk, LLC #PA 444-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/26/2013
FacilityID:424366LocationID:335008
County:GARFIELD #045Location:NWSW 1 7S95W 6
Field:PARACHUTE - #67350Elevation:6027 ft.
Basin:PICEANCE BASIN  
Planned Location:2259FSL  651 FWLLat/Long: 39.465901 / -107.954081Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.465900 / -107.954081Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/21/2013
End Date: 2/21/2013
Reported: 4/5/2013
Days to report: 43
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/26/2013             Measured TD: 8285 ft.    Vertical TD: 7782 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/26/2013
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/18/2013
Proposed Top PZ Location:Sec:2 Twp: 7S 95W Footage: 223 FSL  167 FEL
Bottom Hole Location:Sec:2 Twp: 7S 95W Footage: 223 FSL  167 FEL
Proposed Depth/Form:8292 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFk , Formation: WILLIAMS FORK , Order: 440-35 , Unit Acreage: 320, Drill Unit: E/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1036 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 275, Top: 0 ft., Bottom: 1036 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8292 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 640, Top: 4553 ft., Bottom: 8292 ft.

Wellbore Completed
Completion Date:12/30/2012
Spud Date:12/19/2012Spud Date Is:ACTUAL
Measured TD:8285 ft.Measured PB depth:7861 ft.
True Vertical TD:7782 ft.True Vertical PB depth:7358 ft.
Top PZ Location:Sec:1 Twp: 7s 95wFootage: 219 FSL  134 FEL
Bottom Hole Location:Sec:2 Twp: 7s 95wFootage: 218 FSL  161 FEL
Log Types:Gamma Ray, High Definition Induction Log, Compensated Z-Densilog, Compensated Neutron Log, Mud, RPM and RABL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 66 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 44, Top: 0 ft., Bottom: 66 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1040 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 0 ft., Bottom: 1040 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8269 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1230, Top: 3770 ft., Bottom: 8269 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2409 ft.
MESAVERDE4807 ft.
CAMEO7203 ft.
ROLLINS8135 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 3/26/2013                 Interval Top: 6149 ft.    Interval Bottom: 8032 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/22/2013Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/18/2013Treatment End Date:2/21/2013
Treatment Summary:698000#40/70 Sand; 19433 Bbls Slickwater; (Summary) *All flowback water entries are total estimates based on comingled volumes.
Total fluid used in treatment (bbls):19433Max pressure during treatment (psi):6499
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):19433Total flowback volume recovered (bbls):10866
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):698000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7849 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/26/2013Test Method:flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1017
CALC_MCF_GAS 714
CASING_PRESS 1478
MCF_GAS 714
TUBING_PRESS 1049
Perforation Data:
Interval Top:6149 ft.# Of Holes:131
Interval Bottom:8032 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)31
Total Gas Produced (MCF)17283
GOR557516
GOR DeterminationMCFE
Average BOE per Day8.255
Average MCFE per Day47.866

 Federal Financial Assurance  i 

 Tribal Well  i No