Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-20898
Well Classification: GW Status: PR - 1/1/2020
Well Name/No:Diamond Elk, LLC #PA 44-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2020
FacilityID:424364LocationID:335008
County:GARFIELD #045Location:NWSW 1 7S95W 6
Field:PARACHUTE - #67350Elevation:6027 ft.
Basin:PICEANCE BASIN  
Planned Location:2286FSL  665 FWLLat/Long: 39.465974 / -107.954033Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.465974 / -107.954063Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/15/2013
End Date: 4/19/2013
Reported: 8/23/2013
Days to report: 126
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2020             Measured TD: 8148 ft.    Vertical TD: 7825 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2020
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/18/2013
Proposed Top PZ Location:Sec:2 Twp: 7S 95W Footage: 1015 FSL  571 FEL
Bottom Hole Location:Sec:2 Twp: 7S 95W Footage: 1015 FSL  571 FEL
Proposed Depth/Form:8152 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFk , Formation: WILLIAMS FORK , Order: 440-35 , Unit Acreage: 320, Drill Unit: E/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1145 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 302, Top: 0 ft., Bottom: 1145 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8152 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 643, Top: 4392 ft., Bottom: 8152 ft.

Wellbore Completed
Completion Date:2/11/2013
Spud Date:2/3/2013Spud Date Is:ACTUAL
Measured TD:8148 ft.Measured PB depth:8090 ft.
True Vertical TD:7825 ft.True Vertical PB depth:7767 ft.
Top PZ Location:Sec:2 Twp: 7S 95WFootage: 1014 FSL  543 FEL
Bottom Hole Location:Sec:2 Twp: 7S 95WFootage: 996 FSL  558 FEL
Log Types:CBL, Mud, and Reservoir Performance Monitor (RPM)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 40 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 44, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1175 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 0 ft., Bottom: 1175 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8128 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1155, Top: 2130 ft., Bottom: 8128 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2348 ft.
MESAVERDE4694 ft.
CAMEO7043 ft.
ROLLINS8020 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 1/1/2020                  Interval Top: 5828 ft.    Interval Bottom: 7921 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/15/2013Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/12/2013Treatment End Date:4/19/2013
Treatment Summary:817400# 40/70 Sand; 22182 Bbls Slickwater; (Summary) *All flowback water entries are total estimates based on commingled volumes.
Total fluid used in treatment (bbls):22182Max pressure during treatment (psi):6491
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.71
Recycled water used in treatment (bbls):22182Total flowback volume recovered (bbls):12990
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):817400Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7718 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/31/2013Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1064
CALC_MCF_GAS 757
CASING_PRESS 1334
MCF_GAS 757
TUBING_PRESS 1015
Perforation Data:
Interval Top:5828 ft.# Of Holes:135
Interval Bottom:7921 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)29
Total Gas Produced (MCF)16892
GOR582482
GOR DeterminationMCFE
Average BOE per Day8.060
Average MCFE per Day46.765

 Federal Financial Assurance  i 

 Tribal Well  i No