Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-20889
Well Classification: GW Status: PR - 6/10/2013
Well Name/No:Diamond Elk, LLC #PA 443-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/10/2013
FacilityID:424355LocationID:335008
County:GARFIELD #045Location:NWSW 1 7S95W 6
Field:PARACHUTE - #67350Elevation:6027 ft.
Basin:PICEANCE BASIN  
Planned Location:2299FSL  672 FWLLat/Long: 39.466011 / -107.954009Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.466011 / -107.954009Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/15/2013
End Date: 4/19/2013
Reported: 8/23/2013
Days to report: 126
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/10/2013             Measured TD: 8115 ft.    Vertical TD: 7854 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/10/2013
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/18/2013
Proposed Top PZ Location:Sec:2 Twp: 7S 95W Footage: 1640 FSL  603 FEL
Bottom Hole Location:Sec:2 Twp: 7S 95W Footage: 1640 FSL  603 FEL
Proposed Depth/Form:8138 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFk , Formation: WILLIAMS FORK , Order: 440-35 , Unit Acreage: 320, Drill Unit: E/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1210 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 318, Top: 0 ft., Bottom: 1210 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8138 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 692, Top: 4368 ft., Bottom: 8138 ft.

Wellbore Completed
Completion Date:3/21/2013
Spud Date:3/13/2013Spud Date Is:ACTUAL
Measured TD:8115 ft.Measured PB depth:8060 ft.
True Vertical TD:7854 ft.True Vertical PB depth:7799 ft.
Top PZ Location:Sec:2 Twp: 7S 95WFootage: 1631 FSL  578 FEL
Bottom Hole Location:Sec:2 Twp: 7S 95WFootage: 1614 FSL  595 FEL
Log Types:CBL, Mud, and Reservoir Performance Monitor (RPM)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 40 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 44, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1210 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1210 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8093 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1360, Top: 2370 ft., Bottom: 8093 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2339 ft.
MESAVERDE4657 ft.
CAMEO7043 ft.
ROLLINS7958 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 5/31/2013                 Interval Top: 5682 ft.    Interval Bottom: 7897 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/17/2013Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/12/2013Treatment End Date:4/19/2013
Treatment Summary:721200# 40/70 Sand; 19534 Bbls Slickwater; (Summary) *All flowback water entries are total estimates based on commingled volumes.
Total fluid used in treatment (bbls):19534Max pressure during treatment (psi):5712
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:5
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.70
Recycled water used in treatment (bbls):19534Total flowback volume recovered (bbls):10980
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):721200Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7690 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/31/2013Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1066
CALC_MCF_GAS 775
CASING_PRESS 1429
MCF_GAS 775
TUBING_PRESS 1021
Perforation Data:
Interval Top:5682 ft.# Of Holes:113
Interval Bottom:7897 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)24
Total Gas Produced (MCF)13955
GOR581458
GOR DeterminationMCFE
Average BOE per Day6.657
Average MCFE per Day38.635

 Federal Financial Assurance  i 

 Tribal Well  i No