|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 6/10/2013 Measured TD: 8590 ft. Vertical TD: 7757 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 6/10/2013 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/14/2013 | | Proposed Top PZ Location: | Sec:2 Twp: 7S 95W | Footage: 1114 FSL 1933 FEL | | Bottom Hole Location: | Sec:2 Twp: 7S 95W | Footage: 1114 FSL 1933 FEL | | Proposed Depth/Form: | 8610 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFk , Formation: WILLIAMS FORK , Order: 440-35 , Unit Acreage: 320, Drill Unit: E/2 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 45 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1493 ft., Weight: 32.3 , Citings Type: PLANNED | | Cement: | Sacks: 388, Top: 0 ft., Bottom: 1493 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8610 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 641, Top: 5865 ft., Bottom: 8610 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/3/2013 | | Spud Date: | 2/21/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 8590 ft. | Measured PB depth: | 8176 ft. | | True Vertical TD: | 7757 ft. | True Vertical PB depth: | 7343 ft. | | Top PZ Location: | Sec:2 Twp: 7s 95w | Footage: 1083 FSL 1914 FEL | | Bottom Hole Location: | Sec:2 Twp: 7s 95w | Footage: 1076 FSL 1920 FEL | | Log Types: | CBL, Mud, and Reservoir Performance Monitor (RPM) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 40 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 44, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1516 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 390, Top: 0 ft., Bottom: 1516 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8572 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1280, Top: 3746 ft., Bottom: 8572 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 3746 ft., Depth: 3810 ft., Bottom: 3821 ft., Sacks: 250, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 2519 ft. | | | | | MESAVERDE | 5089 ft. | | | | | CAMEO | 7517 ft. | | | | | ROLLINS | 8439 ft. | | | |
Formation WFCM Formation Classification: OW Status: PR - 6/15/2013 Interval Top: 6646 ft. Interval Bottom: 8348 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 4/19/2013 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/15/2013 | Treatment End Date: | 4/19/2013 | | Treatment Summary: | 587500#40/70 Sand; 16414 Bbls Slickwater; (Summary)
*All flowback water entries are total estimates based on comingled volumes.
| | Total fluid used in treatment (bbls): | 16414 | Max pressure during treatment (psi): | 6271 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 5 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.64 | | Recycled water used in treatment (bbls): | 16414 | Total flowback volume recovered (bbls): | 9771 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 587500 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8181 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/15/2013 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1062 | | CALC_MCF_GAS | 817 | | CASING_PRESS | 1408 | | MCF_GAS | 817 | | TUBING_PRESS | 982 |
| | Perforation Data: | | Interval Top: | 6646 ft. | # Of Holes: | 109 | | Interval Bottom: | 8348 ft. | Hole Size: | 0.3211009 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 26 |
| Total Gas Produced (MCF) | 15492 |
| GOR | 595846 |
| GOR Determination | MCFE |
| Average BOE per Day | 7.390 |
| Average MCFE per Day | 42.855 |
| Federal Financial Assurance | i | Y |
|
|