|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 4/8/2013 Measured TD: 8065 ft. Vertical TD: 7851 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 4/8/2013 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/13/2013 | | Proposed Top PZ Location: | Sec:25 Twp: 6S 93W | Footage: 343 FNL 2511 FEL | | Bottom Hole Location: | Sec:25 Twp: 6S 93W | Footage: 183 FNL 2649 FWL | | Proposed Depth/Form: | 9650 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | Grass Mesa Unit | Unit Number: | COC-056608X | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: Linepipe , Citings Type: PLANNED | | Cement: | Sacks: 5, Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1450 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 447, Top: 0 ft., Bottom: 1450 ft. | | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9650 ft., Weight: 12 , Citings Type: PLANNED | | Cement: | Sacks: 1124, Top: , Bottom: 9650 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/18/2012 | | Spud Date: | 11/10/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8065 ft. | Measured PB depth: | 7987 ft. | | True Vertical TD: | 7851 ft. | True Vertical PB depth: | 7773 ft. | | Top PZ Location: | Sec:25 Twp: 6S 93W | Footage: 185 FNL 2635 FWL | | Bottom Hole Location: | Sec:25 Twp: 6S 93W | Footage: 193 FNL 2649 FWL | | Log Types: | RST, CBL (included on Neutron Log) PEX and Mud. | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 82 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 0, Top: 0 ft., Bottom: 82 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1523 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 530, Top: 0 ft., Bottom: 1523 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8033 ft., Weight: 11.60 , Citings Type: ACTUAL | | Cement: | Sacks: 984, Top: 4120 ft., Bottom: 8065 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | MESAVERDE | 4076 ft. | 4851 ft. | N | N | | WILLIAMS FORK | 4852 ft. | 7818 ft. | N | N | | ROLLINS | 7819 ft. | 8065 ft. | N | N |
Formation WMFK Formation Classification: OW Status: PR - 3/25/2013 Interval Top: 5886 ft. Interval Bottom: 7721 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 2/27/2013 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 2/14/2013 | Treatment End Date: | 3/1/2013 | | Treatment Summary: | Stages 1-7 treated with a total of: 94,001 bbls of Slickwater. | | Total fluid used in treatment (bbls): | 94001 | Max pressure during treatment (psi): | 6039 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.40 | | Type Of gas: | | Number Of staged intervals: | 7 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.82 | | Recycled water used in treatment (bbls): | 94001 | Total flowback volume recovered (bbls): | 56975 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 0 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7065 ft. | | Tubing Packer Depth: | 0 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/25/2013 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 460 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 460 | | CALC_MCF_GAS | 1238 | | CASING_PRESS | 1867 | | MCF_GAS | 1238 | | TUBING_PRESS | 917 |
| | Perforation Data: | | Interval Top: | 5886 ft. | # Of Holes: | 189 | | Interval Bottom: | 7721 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 350 |
| Total Gas Produced (MCF) | 27176 |
| GOR | 77645 |
| GOR Determination | MCFE |
| Average BOE per Day | 13.797 |
| Average MCFE per Day | 79.997 |
| Federal Financial Assurance | i | Y |
|
|