|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 4/8/2013 Measured TD: 8285 ft. Vertical TD: 7885 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 4/8/2013 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/13/2013 | | Proposed Top PZ Location: | Sec:24 Twp: 6S 93W | Footage: 453 FSL 2588 FEL | | Bottom Hole Location: | Sec:25 Twp: 6S 93W | Footage: 519 FSL 2632 FWL | | Proposed Depth/Form: | 8631 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | Grass Mesa Unit | Unit Number: | COC-056608X | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: linepipe , Citings Type: PLANNED | | Cement: | Sacks: 5, Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1290 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 404, Top: 0 ft., Bottom: 1290 ft. | | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8631 ft., Weight: 12 , Citings Type: PLANNED | | Cement: | Sacks: 873, Top: , Bottom: 8631 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/8/2012 | | Spud Date: | 11/5/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8285 ft. | Measured PB depth: | 8285 ft. | | True Vertical TD: | 7885 ft. | True Vertical PB depth: | 7885 ft. | | Top PZ Location: | Sec:24 Twp: 6S 93W | Footage: 465 FSL 2603 FWL | | Bottom Hole Location: | Sec:24 Twp: 6S 93W | Footage: 497 FSL 2623 FWL | | Log Types: | RST, CBL (included on Neutron Log) and Mud. | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 82 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 0, Top: 0 ft., Bottom: 82 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1527 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 540, Top: 0 ft., Bottom: 1527 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8254 ft., Weight: 11.60 , Citings Type: ACTUAL | | Cement: | Sacks: 916, Top: 2900 ft., Bottom: 8285 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | MESAVERDE | 4210 ft. | 5022 ft. | N | N | | WILLIAMS FORK | 5023 ft. | 8029 ft. | N | N | | ROLLINS | 8030 ft. | 8285 ft. | | |
Formation WMFK Formation Classification: OW Status: PR - 3/19/2013 Interval Top: 6142 ft. Interval Bottom: 7927 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 2/25/2013 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 2/12/2013 | Treatment End Date: | 2/27/2013 | | Treatment Summary: | Stages 1-6 treated with a total of: 182,284 bbls of Slickwater. | | Total fluid used in treatment (bbls): | 182284 | Max pressure during treatment (psi): | 6420 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.40 | | Type Of gas: | | Number Of staged intervals: | 6 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.82 | | Recycled water used in treatment (bbls): | 182284 | Total flowback volume recovered (bbls): | 72859 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 0 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7225 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/19/2013 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 803 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 803 | | CALC_MCF_GAS | 2289 | | CASING_PRESS | 2179 | | MCF_GAS | 2289 | | TUBING_PRESS | 1009 |
| | Perforation Data: | | Interval Top: | 6142 ft. | # Of Holes: | 162 | | Interval Bottom: | 7927 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 546 |
| Total Gas Produced (MCF) | 42004 |
| GOR | 76930 |
| GOR Determination | MCFE |
| Average BOE per Day | 21.338 |
| Average MCFE per Day | 123.778 |
| Federal Financial Assurance | i | Y |
|
|