|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 12/10/2012 Measured TD: 11536 ft. Vertical TD: 11164 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 12/10/2012 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 5/14/2013 | | Proposed Top PZ Location: | Sec:16 Twp: 7S 93W | Footage: 2394 FNL 640 FWL | | Bottom Hole Location: | Sec:16 Twp: 7S 93W | Footage: 2394 FNL 640 FWL | | Proposed Depth/Form: | 11737 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEDERAL | | Unit: | Middleton Creek | Unit Number: | COC068997X | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: PLANNED | | Cement: | Sacks: 5, Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1174 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 373, Top: 0 ft., Bottom: 1174 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 11737 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 958, Top: 0 ft., Bottom: 11737 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/21/2012 | | Spud Date: | 7/12/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 11536 ft. | Measured PB depth: | 11536 ft. | | True Vertical TD: | 11164 ft. | True Vertical PB depth: | 11164 ft. | | Top PZ Location: | Sec:16 Twp: 7S 93W | Footage: 2418 FNL 599 FWL | | Bottom Hole Location: | Sec:16 Twp: 7S 93W | Footage: 2458 FNL 568 FWL | | Log Types: | RST, CBL (included in Neutron Log) and Mud. | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 40, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1203 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 422, Top: 0 ft., Bottom: 1203 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11506 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1022, Top: 7750 ft., Bottom: 11536 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 6362 ft. | 9949 ft. | N | N | | ROLLINS | 9950 ft. | 11536 ft. | N | N |
Formation RLNS Formation Classification: OW Status: PR - 12/10/2012 Interval Top: 9960 ft. Interval Bottom: 11217 ft.| Completed Information for Formation ROLLINS | | 1st Production Date: | 11/13/2012 | Choke Size: | | | Formation Name: | ROLLINS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 11/6/2012 | Treatment End Date: | 11/10/2012 | | Treatment Summary: | Stages 1-3 treated with a total of: 28,190 bbls of Slickwater. | | Total fluid used in treatment (bbls): | 28190 | Max pressure during treatment (psi): | 6323 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.50 | | Type Of gas: | | Number Of staged intervals: | 9 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.78 | | Recycled water used in treatment (bbls): | 28190 | Total flowback volume recovered (bbls): | 23698 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 0 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 10658 ft. | | Tubing Packer Depth: | 0 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/10/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 778 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 778 | | CALC_MCF_GAS | 1250 | | CASING_PRESS | 1250 | | MCF_GAS | 1250 |
| | Perforation Data: | | Interval Top: | 9960 ft. | # Of Holes: | 81 | | Interval Bottom: | 11217 ft. | Hole Size: | 0.34 in. |
|
Formation RL-WF Formation Classification: OW Status: CM - 12/10/2012 Interval Top: 8259 ft. Interval Bottom: 11217 ft.| Completed Information for Formation ROLLINS-WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | ROLLINS-WILLIAMS FORK | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 10658 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/10/2012 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 778 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 778 | | CALC_MCF_GAS | 1080 | | CASING_PRESS | 1250 | | MCF_GAS | 1080 |
| | Perforation Data: | | Interval Top: | 8259 ft. | # Of Holes: | 243 | | Interval Bottom: | 11217 ft. | Hole Size: | 0.34 in. |
|
Formation WMFK Formation Classification: OW Status: PR - 11/1/2012 Interval Top: 8259 ft. Interval Bottom: 9909 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 11/13/2012 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 11/6/2012 | Treatment End Date: | 11/10/2012 | | Treatment Summary: | Stages 4-9 treated with a total of: 59,093 bbls of Slickwater. | | Total fluid used in treatment (bbls): | 59093 | Max pressure during treatment (psi): | 6323 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.50 | | Type Of gas: | | Number Of staged intervals: | 9 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.78 | | Recycled water used in treatment (bbls): | 59093 | Total flowback volume recovered (bbls): | 23698 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 0 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 10658 ft. | | Tubing Packer Depth: | 0 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/10/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 778 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 778 | | CALC_MCF_GAS | 1080 | | CASING_PRESS | 1250 | | MCF_GAS | 1080 |
| | Perforation Data: | | Interval Top: | 8259 ft. | # Of Holes: | 162 | | Interval Bottom: | 9909 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 116 |
| Total Gas Produced (MCF) | 35970 |
| GOR | 310086 |
| GOR Determination | MCFE |
| Average BOE per Day | 17.334 |
| Average MCFE per Day | 100.560 |
| Federal Financial Assurance | i | Y |
|
|