Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-20688
Well Classification: GW Status: PR - 1/10/2013
Well Name/No:MCU Fee #16-12C (M16W)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/10/2013
FacilityID:423181LocationID:422418
County:GARFIELD #045Location:SESW 16 7S93W 6
Field:MAMM CREEK - #52500Elevation:7879 ft.
Basin:PICEANCE BASIN  
Planned Location:666FSL  1373 FWLLat/Long: 39.440207 / -107.782929Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.440208 / -107.782934Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/19/2012
End Date: 11/19/2012
Reported: 11/30/2012
Days to report: 11
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/10/2013             Measured TD: 11300 ft.    Vertical TD: 11148 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/10/2013
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/14/2013
Proposed Top PZ Location:Sec:16 Twp: 7S 93W Footage: 1930 FSL  640 FWL
Bottom Hole Location:Sec:16 Twp: 7S 93W Footage: 1930 FSL  640 FWL
Proposed Depth/Form:11514 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEDERAL
Unit:Middleton Creek Unit Number:COC068997X
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 5, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1234 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 389, Top: 0 ft., Bottom: 1234 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 11514 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 954, Top: 0 ft., Bottom: 11514 ft.

Wellbore Completed
Completion Date:10/13/2012
Spud Date:7/20/2012Spud Date Is:ACTUAL
Measured TD:11300 ft.Measured PB depth:11300 ft.
True Vertical TD:11148 ft.True Vertical PB depth:11148 ft.
Top PZ Location:Sec:16 Twp: 7S 93WFootage: 1907 FSL  613 FWL
Bottom Hole Location:Sec:16 Twp: 7S 93WFootage: 1930 FSL  606 FWL
Log Types:RST, CBL (included in Neutron Log) and Mud.
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 40, Top: 0 ft., Bottom: 40 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1255 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 438, Top: 0 ft., Bottom: 1255 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11266 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 537, Top: 5290 ft., Bottom: 11300 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE6375 ft.7148 ft.NN
WILLIAMS FORK7149 ft.10013 ft.NN
ROLLINS10014 ft.10434 ft.NN
COZZETTE10435 ft.10651 ft.NN
CORCORAN10652 ft.11148 ft.NN

Formation CRCRN                   Formation Classification:  OW                   Status:  PR - 1/10/2013                 Interval Top: 10736 ft.    Interval Bottom: 11027 ft.

 Completed Information for Formation CORCORAN
1st Production Date:1/3/2013Choke Size: 
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/6/2012Treatment End Date:11/19/2012
Treatment Summary:Stage 1 treated with a total of: 73,643 bbls of Slickwater.
Total fluid used in treatment (bbls):73643Max pressure during treatment (psi):6370
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:9
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.79
Recycled water used in treatment (bbls):73643Total flowback volume recovered (bbls):11348
Fresh water used in treatment (bbls):0Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:10422 ft.
Tubing Packer Depth:0 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/10/2013Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_MCF_GAS 553
CASING_PRESS 2450
MCF_GAS 553
TUBING_PRESS 1300
Perforation Data:
Interval Top:10736 ft.# Of Holes:27
Interval Bottom:11027 ft.Hole Size:0.34 in.

Formation COZZ                     Formation Classification:  OW                     Status:  PR - 1/10/2013                 Interval Top: 10450 ft.    Interval Bottom: 10707 ft.

 Completed Information for Formation COZZETTE
1st Production Date:1/3/2013Choke Size: 
Formation Name:COZZETTECommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/6/2012Treatment End Date:11/19/2012
Treatment Summary:Stage 2 treated with a total of: 73,643 bbls of Slickwater.
Total fluid used in treatment (bbls):73643Max pressure during treatment (psi):6370
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:9
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.79
Recycled water used in treatment (bbls):73643Total flowback volume recovered (bbls):11348
Fresh water used in treatment (bbls):0Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:10422 ft.
Tubing Packer Depth:0 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/10/2013Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_MCF_GAS 553
CASING_PRESS 2450
MCF_GAS 553
TUBING_PRESS 1300
Perforation Data:
Interval Top:10450 ft.# Of Holes:27
Interval Bottom:10707 ft.Hole Size:0.34 in.

Formation WMFK                     Formation Classification:  OW                     Status:  PR - 1/10/2013                 Interval Top: 7972 ft.    Interval Bottom: 9971 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:1/3/2013Choke Size: 
Formation Name:WILLIAMS FORKCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/6/2012Treatment End Date:11/19/2012
Treatment Summary:Stages 3-9 treated with a total of: 73,643 bbls of Slickwater.
Total fluid used in treatment (bbls):73643Max pressure during treatment (psi):6370
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:9
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.79
Recycled water used in treatment (bbls):73643Total flowback volume recovered (bbls):11348
Fresh water used in treatment (bbls):0Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:10422 ft.
Tubing Packer Depth:0 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/10/2013Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_MCF_GAS 553
CASING_PRESS 2450
MCF_GAS 553
TUBING_PRESS 1300
Perforation Data:
Interval Top:7972 ft.# Of Holes:189
Interval Bottom:9971 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)66
Total Gas Produced (MCF)20272
GOR307151
GOR DeterminationMCFE
Average BOE per Day9.784
Average MCFE per Day56.737

 Federal Financial Assurance  i Y

 Tribal Well  i No