|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 1/12/2012 Measured TD: 5564 ft. Vertical TD: 5134 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 1/12/2012 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/10/2013 | | Proposed Top PZ Location: | Sec:27 Twp: 7S 96W | Footage: 1121 FNL 2421 FEL | | Bottom Hole Location: | Sec:27 Twp: 7S 96W | Footage: 1121 FNL 2421 FEL | | Proposed Depth/Form: | 5543 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-14 , Unit Acreage: 160, Drill Unit: NE/4 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48# , Citings Type: PLANNED | | Cement: | Sacks: 25, Top: 0 ft., Bottom: 45 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1277 ft., Weight: 32.3# , Citings Type: PLANNED | | Cement: | Sacks: 446, Top: 0 ft., Bottom: 1277 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5543 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 515, Top: , Bottom: 5543 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/21/2011 | | Spud Date: | 10/15/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 5564 ft. | Measured PB depth: | 5424 ft. | | True Vertical TD: | 5134 ft. | True Vertical PB depth: | 4994 ft. | | Top PZ Location: | Sec:27 Twp: 7s 96w | Footage: 1135 FNL 2404 FEL | | Bottom Hole Location: | Sec:27 Twp: 7s 96w | Footage: 1141 FNL 2423 FEL | | Log Types: | CBL, MUD, & RPM | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 42 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 16, Top: 0 ft., Bottom: 42 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1236 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 1236 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5556 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 980, Top: 5080 ft., Bottom: 5556 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 3995 ft., Depth: 5012 ft., Bottom: 5080 ft., Sacks: 550, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 3995 ft., Depth: 4875 ft., Bottom: 5080 ft., Sacks: 500, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 688 ft. | | | | | MESAVERDE | 2587 ft. | | | | | CAMEO | 4931 ft. | | | | | ROLLINS | 5435 ft. | | | |
Formation WFCM Formation Classification: GW Status: PR - 1/12/2012 Interval Top: 4348 ft. Interval Bottom: 5378 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 11/30/2011 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/16/2011 | | Treatment Summary: | 666005# 30/50 Sand; 13615 BBL's Slickwater (summary). |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5180 ft. | | Tubing Packer Depth: | 4656 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/12/2012 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1061 | | CALC_MCF_GAS | 1069 | | CASING_PRESS | 668 | | MCF_GAS | 1069 | | TUBING_PRESS | 527 |
| | Perforation Data: | | Interval Top: | 4348 ft. | # Of Holes: | 80 | | Interval Bottom: | 5378 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 20 |
| Total Gas Produced (MCF) | 15535 |
| GOR | 776750 |
| GOR Determination | MCFE |
| Average BOE per Day | 7.370 |
| Average MCFE per Day | 42.777 |
| Federal Financial Assurance | i | |
|
|