|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 12/26/2012 Measured TD: 7736 ft. Vertical TD: 7721 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 12/26/2012 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/6/2013 | | Proposed Top PZ Location: | Sec:35 Twp: 6S 94W | Footage: 2431 FNL 529 FWL | | Bottom Hole Location: | Sec:35 Twp: 6S 94W | Footage: 2431 FNL 529 FWL | | Proposed Depth/Form: | 7634 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 139-66 , Unit Acreage: 640, Drill Unit: All | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48# , Citings Type: PLANNED | | Cement: | Sacks: 25, Top: 0 ft., Bottom: 45 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1103 ft., Weight: 32.3# , Citings Type: PLANNED | | Cement: | Sacks: 385, Top: 0 ft., Bottom: 1103 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7634 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 625, Top: , Bottom: 7634 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/3/2012 | | Spud Date: | 8/27/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7736 ft. | Measured PB depth: | 7668 ft. | | True Vertical TD: | 7721 ft. | True Vertical PB depth: | 7653 ft. | | Top PZ Location: | Sec:35 Twp: 6S 94W | Footage: 2424 FNL 528 FWL | | Bottom Hole Location: | Sec:35 Twp: 6S 94W | Footage: 2451 FNL 510 FWL | | Log Types: | RPM/CBL/MUDLOGS | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 43 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 16, Top: 0 ft., Bottom: 43 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1155 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 1155 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7700 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1275, Top: 2880 ft., Bottom: 7700 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 1505 ft. | | | | | MESAVERDE | 3974 ft. | | | | | CAMEO | 6720 ft. | | | | | ROLLINS | 7643 ft. | | | |
Formation WFCM Formation Classification: OW Status: PR - 12/26/2012 Interval Top: 5427 ft. Interval Bottom: 7526 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 10/16/2012 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/11/2012 | Treatment End Date: | 10/26/2012 | | Treatment Summary: | 4018 Gals 7 ½% HCL; 836050 # 30/50 Sand; 188300 100/Mesh; 29855 Bbls Slickwater (Summary)
| | Total fluid used in treatment (bbls): | 29951 | Max pressure during treatment (psi): | 5058 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 7 | | Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | 0.78 | | Recycled water used in treatment (bbls): | 29855 | Total flowback volume recovered (bbls): | 12845 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 1024350 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7298 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/26/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1123 | | CALC_MCF_GAS | 925 | | CASING_PRESS | 1791 | | MCF_GAS | 925 | | TUBING_PRESS | 1583 |
| | Perforation Data: | | Interval Top: | 5427 ft. | # Of Holes: | 152 | | Interval Bottom: | 7526 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 93 |
| Total Gas Produced (MCF) | 42389 |
| GOR | 455795 |
| GOR Determination | MCFE |
| Average BOE per Day | 20.284 |
| Average MCFE per Day | 117.626 |
| Federal Financial Assurance | i | Y |
|
|