|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 9/30/2012 Measured TD: 7952 ft. Vertical TD: 7691 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 9/30/2012 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/6/2013 | | Proposed Top PZ Location: | Sec:35 Twp: 6S 94W | Footage: 2615 FSL 1947 FWL | | Bottom Hole Location: | Sec:35 Twp: 6S 94W | Footage: 2639 FSL 1938 FWL | | Proposed Depth/Form: | 7936 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 139-66 , Unit Acreage: 640, Drill Unit: All | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48# , Citings Type: PLANNED | | Cement: | Sacks: 25, Top: 0 ft., Bottom: 45 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1123 ft., Weight: 32.3# , Citings Type: PLANNED | | Cement: | Sacks: 391, Top: 0 ft., Bottom: 1123 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7936 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 635, Top: , Bottom: 7936 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/4/2012 | | Spud Date: | 7/26/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7952 ft. | Measured PB depth: | 7887 ft. | | True Vertical TD: | 7691 ft. | True Vertical PB depth: | 7626 ft. | | Top PZ Location: | Sec:35 Twp: 6S 94W | Footage: 2615 FSL 1947 FWL | | Bottom Hole Location: | Sec:35 Twp: 6S 94W | Footage: 2639 FSL 1938 FWL | | Log Types: | RPM/CBL/MUDLOGS | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 62 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 23, Top: 0 ft., Bottom: 62 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1165 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 1165 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7922 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1290, Top: 3386 ft., Bottom: 7922 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 1636 ft. | | | | | MESAVERDE | 4221 ft. | | | | | CAMEO | 6980 ft. | | | | | ROLLINS | 7885 ft. | | | |
Formation WFCM Formation Classification: GW Status: PR - 9/30/2012 Interval Top: 5885 ft. Interval Bottom: 7781 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 8/28/2012 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/22/2012 | Treatment End Date: | 8/31/2012 | | Treatment Summary: | 3516 Gals 7 ½% HCL; 701500 # 30/50 Sand; 158500 100/Mesh; 25406 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 25490 | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 6 | | Total acid used in treatment (bbls): | 83 | Min frac gradient (psi/ft): | 0.81 | | Recycled water used in treatment (bbls): | 25406 | Total flowback volume recovered (bbls): | 9697 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 860000 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7570 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/30/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1156 | | CALC_MCF_GAS | 920 | | CASING_PRESS | 2032 | | MCF_GAS | 920 | | TUBING_PRESS | 1688 |
| | Perforation Data: | | Interval Top: | 5885 ft. | # Of Holes: | 132 | | Interval Bottom: | 7781 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 60 |
| Total Gas Produced (MCF) | 26964 |
| GOR | 449400 |
| GOR Determination | MCFE |
| Average BOE per Day | 12.903 |
| Average MCFE per Day | 74.839 |
| Federal Financial Assurance | i | Y |
|
|