|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 10/12/2012 Measured TD: 7970 ft. Vertical TD: 7731 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 10/12/2012 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/6/2013 | | Proposed Top PZ Location: | Sec:35 Twp: 6S 94W | Footage: 1710 FNL 1971 FWL | | Bottom Hole Location: | Sec:35 Twp: 6S 94W | Footage: 1710 FNL 1971 FWL | | Proposed Depth/Form: | 7917 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 139-66 , Unit Acreage: 640, Drill Unit: All | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48# , Citings Type: PLANNED | | Cement: | Sacks: 25, Top: 0 ft., Bottom: 45 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1125 ft., Weight: 32.3# , Citings Type: PLANNED | | Cement: | Sacks: 392, Top: 0 ft., Bottom: 1125 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7917 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 633, Top: , Bottom: 7917 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/24/2012 | | Spud Date: | 6/16/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7970 ft. | Measured PB depth: | 7923 ft. | | True Vertical TD: | 7731 ft. | True Vertical PB depth: | 7684 ft. | | Top PZ Location: | Sec:35 Twp: 6S 94W | Footage: 1675 FNL 1982 FWL | | Bottom Hole Location: | Sec:35 Twp: 6S 94W | Footage: 1692 FNL 1965 FWL | | Log Types: | RPM/CBL/MUDLOGS | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 40 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 15, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1140 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 380, Top: 0 ft., Bottom: 1140 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7957 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1290, Top: 2110 ft., Bottom: 7957 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 1606 ft. | | | | | MESAVERDE | 4188 ft. | | | | | CAMEO | 7019 ft. | | | | | ROLLINS | 7931 ft. | | | |
Formation WFCM Formation Classification: OW Status: PR - 9/25/2012 Interval Top: 5952 ft. Interval Bottom: 7790 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 8/28/2012 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/22/2012 | Treatment End Date: | 8/31/2012 | | Treatment Summary: | 3499 Gals 7 ½% HCL; 648700 # 30/50 Sand; 140500 100/Mesh; 23280 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 23364 | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 6 | | Total acid used in treatment (bbls): | 83 | Min frac gradient (psi/ft): | 0.83 | | Recycled water used in treatment (bbls): | 23280 | Total flowback volume recovered (bbls): | 10438 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 789200 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7600 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/25/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1179 | | CALC_MCF_GAS | 1170 | | CASING_PRESS | 2247 | | MCF_GAS | 1170 | | TUBING_PRESS | 1990 |
| | Perforation Data: | | Interval Top: | 5952 ft. | # Of Holes: | 128 | | Interval Bottom: | 7790 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 48 |
| Total Gas Produced (MCF) | 21583 |
| GOR | 449645 |
| GOR Determination | MCFE |
| Average BOE per Day | 10.328 |
| Average MCFE per Day | 59.898 |
| Federal Financial Assurance | i | Y |
|
|