|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 2/29/2012 Measured TD: 8290 ft. Vertical TD: 8172 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 2/29/2012 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/26/2013 | | Proposed Top PZ Location: | Sec:29 Twp: 6S 95W | Footage: 176 FNL 1007 FEL | | Bottom Hole Location: | Sec:29 Twp: 6S 95W | Footage: 176 FNL 1007 FEL | | Proposed Depth/Form: | 8327 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: , Drill Unit: Unspaced | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 45 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2758 ft., Weight: 32.3 , Citings Type: PLANNED | | Cement: | Sacks: 961, Top: 0 ft., Bottom: 2758 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8327 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 616, Top: 4543 ft., Bottom: 8327 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/26/2011 | | Spud Date: | 10/16/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8290 ft. | Measured PB depth: | 8240 ft. | | True Vertical TD: | 8172 ft. | True Vertical PB depth: | 8122 ft. | | Top PZ Location: | Sec:25 Twp: 6s 95 | Footage: 173 FNL 992 FEL | | Bottom Hole Location: | Sec:29 Twp: 6s 95w | Footage: 172 FNL 1004 FEL | | Log Types: | SP/GR/HDIL/ZDL/CN and CBL and Reservoir Performance Monitor (RPM | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 66 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 32, Top: 0 ft., Bottom: 66 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2816 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 675, Top: 0 ft., Bottom: 2816 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8275 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 985, Top: 3550 ft., Bottom: 8275 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 2566 ft. | | | | | MESAVERDE | 4762 ft. | | | | | CAMEO | 7456 ft. | | | | | ROLLINS | 8151 ft. | | | |
Formation WFCM Formation Classification: GW Status: PR - 2/29/2012 Interval Top: 5913 ft. Interval Bottom: 8084 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 12/11/2011 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/10/2011 | | Treatment Summary: | 4033 Gals 7 1/2% HCL; 889300# 40/70 Sand; 25705 Bbls Slickwater; (Summary)
*All flowback water entries are total estimates based on comingled volumes.
Please note: the "as-drilled" GPS information provided is actual data of the existing well conductor location prior to the big rig spud date. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7843 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/29/2012 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1080 | | CALC_MCF_GAS | 1115 | | CASING_PRESS | 1152 | | MCF_GAS | 1115 | | TUBING_PRESS | 772 |
| | Perforation Data: | | Interval Top: | 5913 ft. | # Of Holes: | 158 | | Interval Bottom: | 8084 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 48 |
| Total Gas Produced (MCF) | 21650 |
| GOR | 451041 |
| GOR Determination | MCFE |
| Average BOE per Day | 10.364 |
| Average MCFE per Day | 60.089 |
| Federal Financial Assurance | i | Y |
|
|