|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 2/1/2022 Measured TD: 8138 ft. Vertical TD: 7447 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 2/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/26/2013 | | Proposed Top PZ Location: | Sec:15 Twp: 6S 92W | Footage: 1480 FSL 1958 FWL | | Bottom Hole Location: | Sec:15 Twp: 6S 92W | Footage: 1480 FSL 1958 FWL | | Proposed Depth/Form: | 7740 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: 191-25 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 191-24 , Unit Acreage: 320, Drill Unit: S/2 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 55# , Citings Type: PLANNED | | Cement: | Sacks: 177, Top: 0 ft., Bottom: 60 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 24/32# , Citings Type: PLANNED | | Cement: | Sacks: 416, Top: 0 ft., Bottom: 1000 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7740 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 356, Top: , Bottom: 7740 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/18/2012 | | Spud Date: | 7/11/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8138 ft. | Measured PB depth: | 8080 ft. | | True Vertical TD: | 7447 ft. | True Vertical PB depth: | 7389 ft. | | Top PZ Location: | Sec:15 Twp: 6S 92W | Footage: 805 FSL 2379 FEL | | Bottom Hole Location: | Sec:15 Twp: 6S 92W | Footage: 813 FSL 2385 FEL | | Log Types: | Temp, Mud Log, CBL | | Log Types: | CBL, Temp, Mud Log | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 84 ft., Weight: 55# , Citings Type: ACTUAL | | Cement: | Sacks: 177, Top: 0 ft., Bottom: 84 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1027 ft., Weight: 32# , Citings Type: ACTUAL | | Cement: | Sacks: 365, Top: 0 ft., Bottom: 1027 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8080 ft., Weight: 11.6# , Citings Type: ACTUAL | | Cement: | Sacks: 1095, Top: 2076 ft., Bottom: 8138 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 3973 ft. | | | | | ROLLINS | 7960 ft. | | | |
Formation WFCM Formation Classification: GW Status: PR - 2/1/2022 Interval Top: 6263 ft. Interval Bottom: 7927 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 3/19/2012 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/18/2012 | | Treatment Summary: | WFCM - Frac'd with 89,700 bbls 2% Slickwater, 1,398,700 lbs 30/50 Sand, 864,400 20/40 Sand, 237,300 20/40 SLC sand |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7506 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/20/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 540 | | BTU_GAS | 1124 | | CALC_BBLS_H2O | 540 | | CALC_MCF_GAS | 2768 | | CASING_PRESS | 900 | | MCF_GAS | 2768 | | TUBING_PRESS | 1600 |
| | Perforation Data: | | Interval Top: | 6263 ft. | # Of Holes: | 208 | | Interval Bottom: | 7927 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 318 |
| Total Gas Produced (MCF) | 24492 |
| GOR | 77018 |
| GOR Determination | MCFE |
| Average BOE per Day | 12.440 |
| Average MCFE per Day | 72.169 |
| Federal Financial Assurance | i | |
|
|